BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 28, 2024 at 8:00 PM

Updated August 29, 2024

Site work for a road / highway in Coffeyville, Kansas. Completed plans call for site work for a road / highway.

Scope of Work The selected contractor will be responsible for: Procuring and transporting all necessary materials and equipment. Installing street lights according to the specifications provided. Ensuring all installations comply with safety and electrical standards. Removing and disposing of old fixtures, if applicable. Conducting tests and inspections to ensure proper functionality. Providing a warranty for workmanship and materials All questions regarding this RFB must be submitted in writing to Amber Dean at adean@coffevyille.com by June 21st, 2024. Responses will be shared with all potential bidders. The City of Coffevyille reserves the right to reject any and all bids. The project includes the following components: 1. LED Light Fixture Replacement: a. 150W Street Lights (91 units). b. Black 150W Street Lights (9 units) c. 250W Street Lights(102 units) d. Security Flood Lights (99 units) e. Road Intersection Lights (31 units) f. Security Lights (49 units) 2. Wire Infrastructure Enhancement: a. TT Wire 12/2 Romex:. A total length of 32 feet will be required for the 12' arm/3' to source/3' to light configuration, and 42 feet for the 8' arm/3' to source/3' to light configuration. b. #6 Triplex: Replacement and installation i. 11th St from S. Willow St-North Side: 6,681.60 feet ii. 11th St from S. Willow St-South Side: 6,681.60 feet iii. S. Walnut - West Side: 9,260.52 feet iv. S. Walnut - East Side: 9,260.52 feet v. Walmart - east 8th - Inglewood - North: 31,890.82 feet vi. Walmart - east 8th - Inglewood - South: 31,890.82 fee 3. Scope of Work The selected contractor will be responsible for: o Procuring and transporting all necessary materials and equipment. o Installing street lights according to the specifications provided. o Ensuring all installations comply with safety and electrical standards. o Removing and disposing of old fixtures, if applicable. o Conducting tests and inspections to ensure proper functionality. o Providing a warranty for workmanship and materials. o Adhering to the Davis-Bacon Wage Act requirements, ensuring all laborers and mechanics are paid prevailing wages. o Complying with the Build America Buy America Act, ensuring that all iron, steel, manufactured products, and construction materials used in the project are produced in the United States.

Bid Results

Roads / Highways

$175,009.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
93
Active Projects
26
Bidding Soon
798
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 1, 2024

July 31, 2024

Project location map

Multiple Locations, Coffeyville, KS

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.