Demolition, site work and asbestos abatement for a municipal facility in Mobile, Alabama. Completed plans call for the demolition of a municipal facility; for site work for a municipal facility; and for asbestos abatement for a municipal facility.
Apparent low G&G LAND CLEARING $3,000 Scope of Work: Provide a wet demolition & REMOVE ALL STRUCTURES at the address indicated above, and as described in the attached photos and general notes provided, including all footings, slabs, etc. (FIELD VERIFY) Disconnect and cap off all utility lines, such as sanitary sewer, water, and gas, in a manner satisfactory to the respective agency and the City of Mobile, Municipal Enforcement Department. Contractor shall clear lots by removing all debris resulting from the demolition of structures and all debris as designated in piles, scattered or otherwise on the sites. Contractor is to provide Sediment and Erosion Control measures, grassing, and Best Management Practices for Demolitions where Lead-Based Paint and/or Asbestos containing Materials may be present, per specifications. Submit before and after demolition pictures to City of Mobile Municipal Enforcement Department, along with waste shipment record, Invoice for payment and required close-out documents. Municipal Enforcement following the time established for receipt of Quotes. Contact the Program Coordinator for additional instructions. A City of Mobile Business License is required and must be current at contract execution and throughout contract period. The Contractor shall secure building and other permits customarily obtained from City of Mobile Departments. but at no cost to the contractor. Within two (2) calendar days from the issuance of Contract forms for execution, the Contractor must provide the following: 1. Proof of enrollment in the Federal E-Verify program (see sample document attached as Exhibit 1) 2. Agreement Between Owner and Contractor For A Stipulated Sum (see sample attached as Exhibit 2) 3. Certificate of Insurance and policy endorsements in accordance with City of Mobile Insurance Requirements (attached as Exhibit 3 with sample documents) For payment(s), two (2) signed and notarized originals of the Application and Certificate for Payment shall be submitted on AIA Documents G702 and G703. (Attached as Exhibit 4) At Substantial Completion of the project, the Contractor shall publish a "Notice of Final Completion'. of the contract one time in a newspaper of general circulation. 1. Remove Damaged Wood Frame Structures 2. Field Verify All Site Conditions 3. Remove Cmu/brick Piers and or Concrete Slab(S) Field Verify 4. Remove All Tires, Trash, Roof Remnants, Garbage, Etc. Off Site 5. Aluminum Fence Shall Remain 6. Remove All Vines, Bushes, Shrubs Along the Entire Perimeter and Cut Trees With a Caliper of 8" or Less 4" Above Grade Within the Property Lines/fence Line. 7. Clear Entire Lot, Remove All Trash/garbage, Cut All Grass/weeds Up To Property Lines. 8. Contractor Shall Fill All Voids of Disturbed Areas Per Section 02100 Demolitions by Wet Method and Section 02100 Seeding. 9. Contractor Shall Provide, Install and Maintain All Temporary Erosion Control Measures. (Full Protection of State Water-dog River Watershed) 10. Cap All Sewage Lines at the Curb: Notify Municipal Enforcement Department When Sewage Line is Caped. 11. Before and After Photos Are Required With Pay Request. Contractor shall provide an electronic or hard copy of the Notice verbiage, on Contractor letterhead. to the Program Coordinator at the same time the Notice is submitted to the newspaper. Within five working days after publication, the Contractor shall provide an original proof of newspaper publication to the Program Coordinator. Final settlement shall not be made until Notice has been published and all applicable Close Out documents have been received and approved. A time charge equal to two hundred fifty dollars ($250.00) per calendar day will be made against the Contractor for the entire period that any part of the Work remains uncompleted for more than fifteen (15) calendar days after the time specified for the Substantial Completion of the Work. the amount of which shall be deducted by the Owner, and shall be retained by the Owner out of monies otherwise due the Contractor in the final payment. not as a penalty, but as liquidated damages sustained. Contact the Program Coordinator, Gary Jackson, at the City of Mobile, Neighborhood Taskforce-Municipal Enforcement Department, 251.208.1540 phone or e-mail qarv.jacksoncityofmobile.org for further clarification regarding this Request for Quotes.
Award
Municipal
$3,000.00
Public - City
Asbestos Abatement, Demolition, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 26, 2024
July 26, 2024
1160 Arlington St, Mobile, AL
Related To This Project
Mobile, AL
Bid Date: Jul 24 2024
Mobile, AL
Bid Date: Jun 21 2024
Mobile, AL
Bid Date: Jul 09 2024
Mobile, AL
Bid Date: Jul 24 2024
Mobile, AL
Bid Date: Jul 24 2024
Mobile, AL
Bid Date: Jul 31 2024
Mobile, AL
Bid Date: Jul 31 2024
Mobile, AL
Bid Date: Jul 31 2024
Mobile, AL
Bid Date: Jul 17 2024
Mobile, AL
Bid Date: Jul 26 2024
Mobile, AL
--
Mobile, AL
Bid Date: Jul 01 2024
Mobile, AL
Bid Date: Jul 16 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.