BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 27, 2024 at 8:00 PM

Updated September 28, 2024

Site work, paving and outdoor lighting for a mixed-use development in Richmond Hill, Georgia. Working plans call for site work for a bridge / tunnel; for outdoor lighting for a bridge / tunnel; and for paving for a bridge / tunnel.

As of September 27, 2024, this project was not awarded. It will be readvertised at a later date. Harris Trail Pedestrian Improvements This project provides a pedestrian connection along Harris Trail Road from Timber Trail Road to Brisbon Road. A prefabricated bridge will be included over Sterling Creek. Conduit for lighting will be installed along the corridor. Bids shall be accompanied by a bid bond or certified cashier's check in an amount not less than 10% of the base bid. All bonds shall be by a surety company licensed in Georgia with an "A" minimum rating of performance and a financial strength of at least five times the contract price as listed in the most current publication of "Best's Key Rating Guide Property Liability." Performance and Payment Bonds, each in an amount equal to 100% of the contract price shall be required of the successful bidder if contract is awarded. Each Bond shall be accompanied by a "Power of Attorney" authorizing the attorney-in-fact to bind the surety and certified to include the date of the bond. All questions shall be submitted in writing to the Engineer by Tuesday, August 13th, 2024, at 5 PM. Owner reserves the right to reject any or all Bids, including without limitation, the rights to reject any or all nonconforming, nonresponsive, unbalanced or conditional Bids and to reject the Bid of any Bidder if Owner believes it would not be in the best interest of the Project to make an award to Bidder, whether because the Bid is not responsive or the Bidder is unqualified or of doubtful financial ability or fails to meet any other pertinent standard or criteria established by the Owner.

Final Planning

Sidewalks / Parking Lot

$1,500,000.00

Public - County

Outdoor Lighting, Paving, Site Work

41

9

45

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
56
Bidding Soon
609
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 27, 2024

March 3, 2025

Project location map

Harris Trail Rd, Richmond Hill, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.