BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Hazleton, Pennsylvania. Contact the soliciting agency for additional information.

2024 -2025 Liquid Propane All bids are to be sealed and marked on the outside "Bid for Liquid Propane.” Bid prices must be firm for length of contract (July 1, 2024 – June 30, 2025). No bidder may withdraw his bid for a period of sixty (60) days after date set for the opening thereof. A violation of this provision on part of the bidder or a failure to comply with the award made him shall forfeit to the Owner his deposit as liquidated damages for his breach of this provision. The bid award will be based on the lowest responsible bidder complying with the conditions of the invitation to bid, provided his bid is reasonable and it is to the interest of the owner to accept it. The owner, however, reserves the right to reject any and all bids or parts thereof or items therein and to waive any informality in bids received wherever such rejections or waiver is in the interest of the owner. The owner also reserves the right to reject the bid of a bidder who has previously failed to perform properly or complete on time, bids of a similar nature, or the bid of a bidder who is not in a position, in the opinion of the owner, to perform the bid. Each bidder shall be required to attach to his bid a certified check or bid bond in the amount of five percent (5%) of the base bid. The bidder agrees that the amount of this check is the amount of liquidated damages that will be sustained by the owner in the event of his failure to supply the materials within 120 days from notifications of award of the contract. This check shall then become the property of the School District. All checks, except as stated above, will be promptly returned. Bid items that have been awarded to a vendor are expected to be delivered at the price specified on the vendor’s bid. Failure to deliver a specified bid item will result in vendor forfeiting required 5% bid bond or certified check up to the amount of the next low bidder. The maximum amount a vendor can forfeit by failing to supply a specified bid item is the entire 5% bid bond or certified check.

Post-Bid

Educational

Public - County

Service, Maintenance and Supply

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
205
Active Projects
71
Bidding Soon
1,484
All Active Projects
648
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 26, 2024

July 1, 2024

img_map_placeholder

Multiple Locations, Hazleton, PA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.