BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a water / sewer project in San Diego, California. Completed plans call for site work for a water / sewer project.

Roseville-Fleet Ridge Improvements 1. Estimated Bid Value 11,375,000.00 Scope of Services This is the City's solicitation process to acquire Design-Build services for: WATER MAIN: Replace approximately 5,965 linear feet (1.13 miles) of water mains via an open trench, including all associated water services, fire hydrants, valves, water meters, and other appurtenances. SEWER MAIN: Rehabilitate approximately 10,688 linear feet (2.02 miles) of 8-inch vitrified clay (VC) sewer mains. Install eleven (11) cleanouts and one (1) manhole. Complete six (6) point repairs. Rehabilitate approximately 207 sewer laterals with cleanouts. The project also includes street restoration and curb ramps to bring to ADA standard. Other Details PROJECT DESCRIPTION: This project includes water and sewer facilities identified by the Public Utilities Department as requiring replacement due to age and condition. These replacements will reduce future water and sewer main breaks and reduce maintenance requirements. The project will also bring existing water and sewer mains up to current City Standards. The Project is located within the of the Peninsula Community (Council District 2). The linear footage of water pipes in this project is approximately 5,965 linear feet (LF) (1.13 miles) of 8-inch and 12-inch Polyvinyl Chloride (PVC) water mains to replace existing asbestos cement (AC) water mains. All associated water service, valves, fire hydrants, and other appurtenances will be replaced or added and brought up to the standards in the design guidelines. This project also includes rehabilitation of approximately 10,688 linear feet (2.02 miles) of 8- inch vitrified clay (VC) sewer mains. Install eleven (11) cleanouts and one (1) new manhole. Complete six (6) point repairs and rehabilitate approximately 207 sewer laterals with cleanouts. For locations that are identified for point repairs the sewer main and laterals needs to be rehabbed in addition to the point repairs. All sewer laterals, sewer lateral cleanouts, manholes, and other appurtenances will be rehabilitated and brought up to the standards in the design guidelines. The project may utilize the open trench and trenchless construction methods. It is the responsibility of the Design-Builder to evaluate these two alternatives and provide the most efficient and cost-effective solution in their proposal. Construction will also include approximately 40 dual curb ramps and 3 single curb ramps that are required to be replaced or installed by this project according to new Americans with Disabilities Act (ADA) compliant curb ramps. Depending on the option the designer selects, the numbers may change. Due to locations and existing conditions, some of these curb ramps will require design work. The DCE shall make the final decision on whether design work and details are needed for the project to ensure the curb ramps are constructed appropriately by the Contractor. If the project triggers the curb ramps at the alley corners, then they shall be replaced to current City Standards. In addition, affected driveways are required to be replaced to current standards. The designer shall verify the concrete replacement in Design and make a final determination. This project is affected by a Summer Beach Moratorium between Memorial Day and Labor Day. The water body nearby is the Americas Cup Harbor of North San Diego Bay, which has a summer beach moratorium along its perimeter. This moratorium includes the intersection of Scott St. and Ingelow St. This work includes furnishing all design, labor, materials, equipment, services, and other incidental design, works and appurtenances for the construction of the Project as described in the bridging documents. Project scope also includes street restoration.

Post-Bid

Water / Sewer

$11,375,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

11

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
70
Active Projects
27
Bidding Soon
726
All Active Projects
331
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 29, 2024

October 7, 2024

img_map_placeholder

Multiple Locations, San Diego, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.