Site work for a water / sewer project in San Diego, California. Completed plans call for site work for a water / sewer project.
Roseville-Fleet Ridge Improvements 1. Estimated Bid Value 11,375,000.00 Scope of Services This is the City's solicitation process to acquire Design-Build services for: WATER MAIN: Replace approximately 5,965 linear feet (1.13 miles) of water mains via an open trench, including all associated water services, fire hydrants, valves, water meters, and other appurtenances. SEWER MAIN: Rehabilitate approximately 10,688 linear feet (2.02 miles) of 8-inch vitrified clay (VC) sewer mains. Install eleven (11) cleanouts and one (1) manhole. Complete six (6) point repairs. Rehabilitate approximately 207 sewer laterals with cleanouts. The project also includes street restoration and curb ramps to bring to ADA standard. Other Details PROJECT DESCRIPTION: This project includes water and sewer facilities identified by the Public Utilities Department as requiring replacement due to age and condition. These replacements will reduce future water and sewer main breaks and reduce maintenance requirements. The project will also bring existing water and sewer mains up to current City Standards. The Project is located within the of the Peninsula Community (Council District 2). The linear footage of water pipes in this project is approximately 5,965 linear feet (LF) (1.13 miles) of 8-inch and 12-inch Polyvinyl Chloride (PVC) water mains to replace existing asbestos cement (AC) water mains. All associated water service, valves, fire hydrants, and other appurtenances will be replaced or added and brought up to the standards in the design guidelines. This project also includes rehabilitation of approximately 10,688 linear feet (2.02 miles) of 8- inch vitrified clay (VC) sewer mains. Install eleven (11) cleanouts and one (1) new manhole. Complete six (6) point repairs and rehabilitate approximately 207 sewer laterals with cleanouts. For locations that are identified for point repairs the sewer main and laterals needs to be rehabbed in addition to the point repairs. All sewer laterals, sewer lateral cleanouts, manholes, and other appurtenances will be rehabilitated and brought up to the standards in the design guidelines. The project may utilize the open trench and trenchless construction methods. It is the responsibility of the Design-Builder to evaluate these two alternatives and provide the most efficient and cost-effective solution in their proposal. Construction will also include approximately 40 dual curb ramps and 3 single curb ramps that are required to be replaced or installed by this project according to new Americans with Disabilities Act (ADA) compliant curb ramps. Depending on the option the designer selects, the numbers may change. Due to locations and existing conditions, some of these curb ramps will require design work. The DCE shall make the final decision on whether design work and details are needed for the project to ensure the curb ramps are constructed appropriately by the Contractor. If the project triggers the curb ramps at the alley corners, then they shall be replaced to current City Standards. In addition, affected driveways are required to be replaced to current standards. The designer shall verify the concrete replacement in Design and make a final determination. This project is affected by a Summer Beach Moratorium between Memorial Day and Labor Day. The water body nearby is the Americas Cup Harbor of North San Diego Bay, which has a summer beach moratorium along its perimeter. This moratorium includes the intersection of Scott St. and Ingelow St. This work includes furnishing all design, labor, materials, equipment, services, and other incidental design, works and appurtenances for the construction of the Project as described in the bridging documents. Project scope also includes street restoration.
Post-Bid
Water / Sewer
$11,375,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
11
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 29, 2024
October 7, 2024
Multiple Locations, San Diego, CA
Related To This Project
San Diego, CA
Bid Date: Jun 26 2024
San Diego, CA
Bid Date: Aug 07 2024
San Diego, CA
Bid Date: Jul 25 2024
San Diego, CA
Bid Date: Aug 06 2024
San Diego, CA
Bid Date: Jul 11 2024
San Diego, CA
Bid Date: Sep 09 2024
San Diego, CA
Bid Date: Nov 06 2024
San Diego, CA
Bid Date: Aug 06 2024
San Diego, CA
Bid Date: Aug 01 2024
San Diego, CA
Bid Date: Jul 09 2019
San Diego, CA
Bid Date: Jul 08 2024
San Diego, CA
Bid Date: Nov 12 2024
San Diego, CA
Bid Date: Jul 24 2024
San Diego, CA
--
San Diego, CA
Bid Date: Jun 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.