Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 4, 2024 at 8:00 PM
Updated August 5, 2024
Demolition, site work, paving and new construction of a bridge / tunnel in Allendale, Michigan. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; for the demolition of a bridge / tunnel; and for the construction of a bridge / tunnel.
Bridge reconstruction including removal and replacement and guardrail work on 48th Avenue over Beaver Creek, Ottawa County. This is a Local Agency project. Net classification required for this project is 1050 Ea or 1050 Fa In addition to the above minimum prequalification requirement for prime contractors this project includes subclassifications of Ea or Fa. If the prime contractor is not prequalified in those subclassifications it must use prequalified subcontractors. Those subcontractors must be designated prior to award of the contract to the confirmed low bidder. Control Sec Job No Federal No BO 70000 214703A 24A0615 MI DOT - 039 - Bridge Reconstruction Including Removal and Replacement and Guardrail Work on 48th Avenue
Award
Bridges / Tunnels
$621,570.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 12, 2024
September 10, 2024
48th Ave, Allendale, MI
Related To This Project
Allendale, MI
--
Allendale, MI
Bid Date: Nov 01 2024
Allendale, MI
--
Allendale, MI
Bid Date: Apr 15 2025
Allendale, MI
--
Allendale, MI
Bid Date: May 28 2025
Allendale, MI
Bid Date: Jun 06 2024
Allendale, MI
Bid Date: May 13 2024
Allendale, MI
Bid Date: May 21 2024
Allendale, MI
Bid Date: Mar 26 2024
Allendale, MI
Bid Date: Dec 19 2023
Allendale, MI
--
Allendale, MI
Bid Date: Oct 13 2023
Allendale, MI
Bid Date: Jun 02 2023
Allendale, MI
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
