BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work for a civil project in Charleston, South Carolina. Design plans call for site work for a water / sewer project.

Lake Dotterer, located within the Church Creek drainage basin. The project aims to develop and evaluate alternative improvement concepts for flood reduction potential in varying design storms and tidal condition scenarios. It will be the selected Firm's responsibility to evaluate varying combinations of the alternative improvement concepts for conceptual cost and benefit (or additional options suggested by the selected Firm with concurrence of the City) to recommend project options. The City will review the project options with the selected Firm from a conceptual cost/benefit perspective and select a project, or series of projects. The selected Firm will then design an approach for the proposed improvements and verify conceptual assumptions. The selected Firm will then obtain the necessary permits and prepare construction plans and drawings for bid. The City will rely on ARPA Grants in support of these efforts. Studies completed by Weston & Sampson have provided details on the existing conditions and include conceptual recommendations for several improvement concepts and will be provided to the selected firm The Consultant should have the ability to meet Minority & Women-Owned Business Enterprise (MWBE) goals established by the City. Please contact the City Project Manager Jordyn Mallett at 843-579-6419 or mallettj@charleston-sc.gov with any questions regarding the project. Please contact Ruth Jordan at 843-724-7434 or jordanr@charleston-sc.gov with questions regarding Minority & Women-Owned Business Enterprise (MWBE) requirements. The method of Contractor Selection has not been Determined at this time As of June 20, 2025, per owner, project is currently in design. Design team identified. General contractor not selected yet. Construction expected in Fall 2026.

Design

Water / Sewer

$790,178.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
8
Bidding Soon
886
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

Project location map

Church Creek Dr, Charleston, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.