BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving, remodeling and addition to a mixed-use development in San Antonio, Texas. Completed plans call for the addition of a 2,500-square-foot pre-engineered storage facility; for the demolition of a pre-engineered storage facility; for the remodel of a 3,000-square-foot pre-engineered storage facility; for site work for a pre-engineered storage facility; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The City of San Antonio (City), Public Works Department (PWD) is issuing a Request for Competitive Sealed Proposals (RFCSP) for qualified firms (Respondents) to provide remodeling and expansion to the existing tactical and firearms buildings. The renovated Tactical and Firearm Facility is an approximately 3,000 one story facility consisting of a classroom, offices, and general storage rooms. The building addition will be a metal structure with a standing seam metal roof and provide additional shading. Exterior cladding will consist of brick masonry to match the existing façade. The site includes a 2500 square foot Shoot House. Equipment for the Shoot House will be provided by a preferred manufacturer and installed by the contractor. The Shoot House will be covered by an open Pre-Engineered metal pavilion. Fenced, accessible walkways from the Tactical and Firearm Facility will be provided. The deadline to ask questions is 7/12/2024 4:00 PM CST. Construction Cost Estimate for Tactical and Firearm Building renovation: $3,600,000.00. Calendar Days: Respondent understands and agrees that this is a 450-calendar day contract. SCOPE OF WORK a. Unless otherwise noted on the equipment schedule, all mechanical equipment shall be mounted on vibration isolators to prevent the transmission of vibration and mechanically transmitted sound to the building structure. b. Vibration isolators shall be selected in accordance with weight distribution so as to produce reasonably uniform deflection. Deflections shall be as noted on the equipment isolator schedule noted here in. c. All vibration isolation devices, including steel bases/forms shall be designed and furnished by a single manufacturer or his qualified representative. Project no. 22142.A Gessner No.: 23-0234

GC Bidding

Warehouse / Distribution - Pre-Engineered Storage Building

$3,600,000.00

Public - City

Addition, Demolition, Paving, Remodeling, Site Work

92

43

115

13

Subscribe For Documents

182 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
56
Active Projects
23
Bidding Soon
1,797
All Active Projects
712
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 13, 2024

January 13, 2025

img_map_placeholder

12200 SE Loop 410 Acc Rd, San Antonio, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.