BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 10, 2024 at 8:00 PM

Updated August 11, 2024

Site work for a power facility in Fargo, North Dakota. Completed plans call for site work for a power facility.

Western Area Power Administration has a requirement for a contractor to provide all labor, materials, equipment, transportation and other resources to complete the construction of Fargo Substation, 230-kV Bus Upgrades in North Dakota. The principal components of the work involve miscellaneous sitework, removing and disposing of electrical equipment, steel structures, and concrete foundations; providing concrete foundation, steel structures, grounding, and conduit; installing coupling capacitor voltage transformers; providing associated electrical equipment; and installing outdoor bus system and control cable. The estimated construction magnitude of this project is between $1,000,000 and $5,000,000. All work is to be completed within 270 days from receipt of Notice to Proceed. All responsible small business concerns may submit a bid which shall be considered by this Agency. This solicitation will be issued on or about July 8, 2024, and the projected bid opening date is August 8, 2024. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Power Plant

$5,000,000.00

Public - Federal

Site Work

106

11

9

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
0
Bidding Soon
159
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 9, 2024

September 9, 2024

Project location map

To Be Determined, Fargo, ND

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.