BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, outdoor lighting and new construction of a mixed-use development in Graham, North Carolina. Completed plans call for the construction of a playground / park / athletic field; for site work for a playground / park / athletic field; for outdoor lighting for a playground / park / athletic field; and water / sewer project.

The goal of this project is to design and build a new Park for the Town of Swepsonville. To accomplish this goal, the town seeks to work in an effective partnering relationship with the successful Design-Builder. The success of this project will depend largely upon the nature of the relationship between the DesignBuilder and Swepsonville. The Town intends to work with the Design-Builder as a team, with common goals of delivering a facility with exceptional quality in the most cost-effective and timely manner, achieving efficiency across the full spectrum of performance. Establish a Short List of Design-Build Firms and Schedule Interviews July 22, 2024 Complete Interviews July 30, 2024 Notify Selected Design-Build Firm and Begin Contract Negotiations August 9, 2024 Complete Contract Negotiations with Selected Team August 16, 2024 Request Council Approval and Town Council Award of Contract August 20, 2024 Begin Design Phase October 1, 2024 Begin Construction April 1, 2025 Project Completion May 31, 2026 The scope of work will include, but is not limited to, the following: 1. Pre-construction project planning to include code analysis, value engineering measures, preliminary cost estimates, and project schedule development. 2. Provide survey, geotechnical evaluation, environmental, and existing utilities. 3. Comprehensive project design, to include utilities, site, and facilities: a. Site Design: Clearing and grubbing, grading and drainage plans, sedimentation and erosion control plans, required stormwater management, layout and staking plans, elevations and sections, construction details, lighting and signage, landscape and planting plans and details. b. Facility Design: Building plan configuration and elevation elements, including exterior building skin materials and colors, foundation, structural and roof systems, building fenestration and openings, overall dimensions, materials testing requirements, Mechanical/Electrical/Plumbing design including systems, equipment, and calculations, energy and performance compliance, systems review, coordination, and integration to include all utilities and controls. 4. Permitting for all aspects of the project. 5. Development and impact fees are not included. 6. Bidding. 7. Site and facility construction of the project. 8. Project management to ensure contractors are performing to design and product specifications, construction administration, and observation. 9. Develop and refine cost estimates and project schedules throughout the process to ensure on-time completion. 10. Bi-weekly meetings with Town staff for updates. 11. Project closeout, commissioning, establishment of warranties and guarantees, equipment training, delivering manuals, final inspection and acceptance, execution of punch list. 12. NOTE: The Town of Swepsonville WILL NOT provide a workspace for the Design-Build Team. The selected Team is responsible for and must provide its workspace. The selected firm should be prepared to meet the town's Liability Insurance requirements. The project scope, duration, and terms shall be negotiated with the selected firm. In addition, the contract will be suitable for both the Town and the selected firm. Any interested respondent must have prior experience with: o All phases of planning, design, construction, and regulatory compliance of similar public facilities o Extensive knowledge of regulations governing design and construction in North Carolina o Properly licensed in North Carolina o Proven capability to produce a successful project while meeting the needs and goals of the Town of Swepsonville effectively and efficiently The project location is 1001 Bob Vaughn Road, Swepsonville, North Carolina. The proposed Park will provide facilities and amenities as described in the Project Summary and Map section of the RFQ. The Town of Swepsonville estimates the total budget of this project is $_4,500,000.00_. Total costs include architectural programming and scope of work identification, design and engineering, construction-related expenses and services, construction administration, testing services, permits, and any other related professional service fees necessary to complete the project fully. Once established, adherence to the budget is essential to the successful completion of this project. Question Deadline 07/09/2024 at 2:00 PM ET Pre-submittal questions should be submitted in writing, via email or mail, by Questions submitted later than this deadline will not be considered. Pre-submittal questions, other inquiries, and responses to this RFQ shall be directed to: Brad Bullis, Town Administrator Town of Swepsonville 2747 Swepsonville-Saxapahaw Rd. Graham, NC 27258 Office: (336) 578-5644 Email: brad.bullis@swepsonvillenc.com The Town of Swepsonville reserves the right to reject any and all submissions for any reason. This RFQ does not obligate the Town to pay any cost incurred by respondents in the preparation and submission of a response, nor does it obligate the Town to accept or contract for any expressed or implied services.

Post-Bid

Playgrounds / Parks / Athletic Fields

$4,500,000.00

Public - City

New Construction, Outdoor Lighting, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

14 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
207
Active Projects
125
Bidding Soon
1,914
All Active Projects
820
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 15, 2024

April 1, 2025

May 31, 2026

img_map_placeholder

To Be Determined, Graham, NC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.