BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a road / highway in Lima, Ohio. Conceptual plans call for site work for a road / highway.

The City of Lima is seeking Proposals for a Consultant to fabricate and install wayfinding signs as part of the Citywide Wayfinding Program. SCOPE OF WORK The Scope of Work includes both fabrication and installation of various types, sizes, and locations of wayfinding signs. The graphic design elements are shown by the details in Attachment B: Citywide Wayfinding Fabrication and Implementation Phase 1. These requirements are intended to establish the basic dimensions and appearance of signs. Within these limitations, the Consultant is responsible for fabrication of phase one, and to make whatever modifications and additions to the details as may be required. The Consultant will provide a submittal of the signage proposed to the City of Lima for approval prior to fabrication and installation. The Consultant shall engineer and fabricate signs to meet, at a minimum, the criteria below: Comply with all Federal, State and Local Codes. Signs shall be fabricated and installed to withstand Ohio environmental factors such as wind, heat, snow, ice, and precipitation for a minimum life of 5 years. All fonts specified must be purchased by the Sign Consultant for use in this program. All final output or implementation of typography and graphics are to be sharp (without serrated or irregular edges) and exactly true to the letter style and/or design form. Signs shall be coated to protect against vandalism. Installation and Demolition The Consultant is responsible for the removal and disposal of existing signs. The Consultant shall keep the premises and the adjoining premises, driveways and streets clean of rubbish caused by the demolition and installation operations, and at the completion of the work shall remove all rubbish, tools, equipment, temporary work and surplus materials, from and about the premises. All rubbish and debris shall be disposed of offsite. The job site shall be left safe, neat and clean at the completion of each day's operation. The Consultant shall be responsible for repairing or correcting damage caused by subcontractor's work, if applicable. It is required that the Consultant complete a walk-through with a City of Lima representative within 10 business days of installation to identify any errors, such as construction or installation issues. Such errors are to be corrected in a timely manner, and to the satisfaction of the City of Lima and Guide Studio.

Conceptual

Roads / Highways

$300,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
44
Bidding Soon
1,044
All Active Projects
491
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.