BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 27, 2024 at 8:00 PM

Updated June 28, 2024

Site work, paving and outdoor lighting for a mixed-use development in Shafter, California. Conceptual plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; water / sewer project; and for outdoor lighting for a road / highway.

Reference Number 0000356096 The project would replace the existing four-way stop controlled intersection with a double-lane roundabout. The roundabout would have an approximately 200-foot diameter with a truck apron. The circulatory path surrounding the center of the roundabout would have concrete pavement with contrasted surface treatment for the truck apron, along with minor raised slopes to accommodate oversized, large load trucks. The roadway would have concrete splitter islands separating the direction of travel within the roundabout approaches and departures. The roundabout would include sidewalks, curbs, bike ramps for pedestrian traffic, lighting, flashing beacons, landscaping or hardscaping, architectural features within the central island, and utility relocations. Objective: Biddable plans, specifications, and estimate for construction of a roundabout at the intersection of 7th Std Road and Route-43 (SR-43). The anticipated limits of improvements would extend half a mile (1/2-mile) out on all approaches to the roundabout. Acquisition of right-of-way is required for construction of the project. The footprint of the project with anticipated right-of-way takes (partial and full takes) shall be accomplished by mid-December of 2024. Question Deadline 07/12/2024 at 5:00 PM PT Questions are submitted online Yes , All questions should be forwarded in writing to Ravi Pudipeddi, City Engineer via email at rpudipeddi@shafter.com. *The City reserves the right to reject any and all proposals, to evaluate proposals, and to accept portions of any proposal, and accept any proposal, which in its opinion, may be in the best interest of the City. The City reserves the right to waive any and all formalities.

Conceptual

Roads / Highways

$4,000,000.00

Public - City

Outdoor Lighting, Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
112
Active Projects
32
Bidding Soon
766
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

Project location map

7th Standard Rd, Shafter, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.