BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 5, 2025 at 7:00 PM

Updated November 7, 2025

Site work and renovation of a mixed-use development in Crater Lake, Oregon. Completed plans call for site work for a road / highway; and for the renovation of a playground / park / athletic field.

The project work is located 71 miles north of Klamath Falls, Oregon in Klamath County, in Crater Lake National Park. Approximate Global Positioning System (GPS) coordinates for the beginning of the project are 42 58'46.63"N, 122 4'59.62"W. Project no. NPS CRLA 2018(1) As of September 16, 2025, the project is currently in the final design and compliance phase. Construction is slated for early summer 2026, and a contractor will be selected in late 2025. The Cleetwood Trail and Marina Improvements project (OR NPS CRLA 2018(1)) at Crater Lake National Park involves extensive construction, rehabilitation, and environmental protection efforts aimed at enhancing visitor access, safety, and infrastructure resilience. Spanning approximately 1.026 miles, the project includes a base schedule and three optional components (Options X, Y, and Z), with work governed by FP-14 specifications and U.S. Customary units. Key construction activities encompass mobilization, surveying, erosion control, removal of existing structures, excavation, installation of retaining walls (rockery, soil nail, gabion, MSE), rock bolts and dowels, structural concrete and steel, reinforced shotcrete, micropiles, fencing, stone masonry restoration, traffic control, utility location, and installation of fixtures such as benches, trash receptacles, and safety ladders. Option X adds structural concrete, steel, pedestrian bridge railing, and micropiles; Option Y includes restroom replacement and vacuum trailer installation; Option Z involves additional slope stabilization and rockfall protection. The project also features rock scaling, anchored wire mesh systems, flexible rockfall barriers, and temporary protection measures. Marina reconstruction includes replacing a failed bulkhead with a new elevated pier and floating dock supported by micropiles. The existing restroom will be replaced with a six-stall accessible vault toilet facility. Environmental compliance is integral, with erosion and sediment control, turbidity monitoring, and wildlife protection measures. The project affects approximately 46.9 acres, including 23 acres of whitebark pine habitat, and is expected to impact 356 individual trees. Mitigation includes avoiding mature tree removal, planting rust-resistant seedlings, and adhering to the Whitebark Pine Conservation Plan. Permits from the U.S. Army Corps of Engineers, EPA, and Oregon DSL authorize in-water work and sediment discharge. Contractors must meet stringent technical and bonding requirements, submit detailed proposals, and adhere to federal labor standards, sustainability mandates, and cybersecurity provisions. Construction scheduling must follow CPM methods with certified updates and documentation. Quality control plans are required for each work feature, with sampling, testing, and inspection protocols. The project is scheduled over three summer seasons from 2024 to 2026, with work restricted to May through October and a winter shutdown from November 1 to June 14. The trail will be closed to the public during construction. For questions on this solicitation please use the following: 360.619.7520 All technical questions must be submitted to wfl.plans-spec@dot.gov; PN - OR NPS CRLA 2018(1), CRLA 266 ESTIMATED PRICE RANGE. The price range of the project work is between $25,000,000 and $35,000,000. General and Technical Questions Regarding Proposed Work for This Project Will Be Accepted Until Close-of-business on 10/30/2025. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Roads / Highways

$35,000,000.00

Public - Federal

Renovation, Site Work

1022

34

68

6

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
25
Active Projects
11
Bidding Soon
117
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 6, 2025

February 27, 2026

Project location map

Cleetwood Cv Trl, Crater Lake, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.