BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Humble, Texas. Completed plans call for the renovation of a educational facility.

Undersigned agrees to begin Work on the District's issued notice to proceed (NTP) and be Substantially Complete by July 25, 2025. A schedule is to be uploaded on Ion Wave that must include the following milestone dates. PROPOSAL BOND: A Bidder's Bond from a bonding company acceptable to the Owner, or a cashier's check, or a certified check, in an amount equal to or greater than 5% of the greatest amount proposed must accompany each proposer's proposal PAYMENT BOND AND PERFORMANCE BOND: A Payment Bond and Performance Bond, each in an amount equal to or greater than 100% of the Contract Sum conditioned upon the faithful performance of the Contract will be required. Please note that all bonding companies presented must be acceptable to the Owner. 2024 MEP Equipment Replacement at 1. Atascocita Middle School 18810 West Lake Houston Parkway, Humble, TX 77346 2. Kingwood Park High School 4015 Woodland Hills Drive, Kingwood, TX 77339 3. Deerwood Elementary School 2920 Forest Garden Drive, Kingwood, TX 77345 4. Lakeshore Elementary School 13333 Breakwater Path Drive, Houston, TX 77044 5. River Pines Elementary School 2400 Cold River Drive, Humble, TX 77396 6. Humble Middle School 11207 Will Clayton Parkway, Humble TX 77346 Question Deadline 07/29/2024 at 3:00 PM CT The Project consists primarily of: 1. The AHU replacement / Boiler System replacement / Roof mounted Fan replacement /Generator replacement at a) Atascocita Middle School 2. Generator Replacement a) Kingwood Park High School b) Atascocita Middle School c) Deerwood Elementary School d) Lakeshore Elementary School e) River Pines Elementary School 3. Boiler Replacement a) Humble Middle School The Project consists of other Work; including, but not limited to: 1. Demo lay in ceiling, tiles and grid within the mechanical rooms 2. Uninstall/reinstall ceiling grids for replacement of plenum installed mechanical equipment. Question Deadline 07/29/2024 at 3:00 PM CT

Post-Bid

Educational

$3,800,000.00

Public - City

Renovation

70

20

64

2

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
130
Active Projects
79
Bidding Soon
2,782
All Active Projects
984
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.