Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in West Bath, Maine. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
The project involves rock excavation, drainage improvements, full depth gravel reconstruction, and hot mix asphalt base paving on a 1,000 linear foot section near Elbow Hill of Birch Point Road. All bidders must furnish the following: 1. A completed Bid Form. 2. Experience Record (see Section 2-D). 3. A list of all subcontractors to be utilized on the project. 4. A bid security in the amount of 5% of the total bid in the form of a Bid Bond or certified check, made out to the Town of West Bath. The successful bidder must furnish the following: 1. Certificate of Insurance (in accordance with Section 3, Article 26) 2. 100% Construction Performance Bond 3. 100% Construction Labor and Material Payment Bond The Town of West Bath will have fourteen (14) calendar days within which to accept or reject any bid. The work can begin on or after August 5, 2024, and rock excavation activities can begin on or after September 3, 2024. The work shall be completed by November 1, 2024. Liquidated damages in the amount of $250 per day are contained in the Contract. The Town of West Bath reserves the right to adjust the quantities contained in the Bid Form as needed in order to stay within the project budget. The Town of West Bath reserves the right to reject any and all bids, to waive any technical or legal deficiencies, and to accept any bid which is deemed to be in the best interest of the Town of West Bath, not necessarily the lowest bid. Work under this contract: A. Work under this Contract includes all work required for the Birch Point Road Reconstruction Phase 2 project for the Town of West Bath. In general, the work involves common and rock excavation, full depth gravel reconstruction, hot mix asphalt base paving, and drainage system improvements on a 1,000 linear foot section of Birch Point Road. The Contractor is required to complete all work required by the Contract Documents to affect a complete job. B. Specific items of work are included, but are not limited to: 1) Providing construction signage, and maintaining traffic control for the entirety of the project. One lane of traffic must be maintained throughout construction excluding intermittent road closures not to exceed 15-minute durations. 2) The Contractor is responsible for dust control, and soil erosion and sedimentation control throughout the duration of the project. 3) Tree and brush removal (incidental). 4) Common excavation and rock excavation. 5) Installation of 6" Type B Underdrain. 6) Stone-lined ditching, grass-lined ditching, flushing existing culverts, and installing 18" HDPE culvert with inlet/outlet riprap protection. 7) Installing gravel base course (MaineDOT Type A) and subbase course (MaineDOT Type D). 8) Installation of steel beam guardrail and riprap slope protection. 9) Installation of 2" hot mix asphalt base pavement (19.0 mm). 10) Installing butt joints at the beginning and end of work, as well as at all paved driveway matches. 11) Applying Erosion Control Mix. 12) Other incidental items required to complete the project.
Bid Results
Roads / Highways
$309,228.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 16, 2024
August 5, 2024
Birch Point Rd, West Bath, ME
Related To This Project
West Bath, ME
Bid Date: Oct 28 2024
West Bath, ME
Bid Date: Sep 14 2023
West Bath, ME
Bid Date: Aug 10 2023
West Bath, ME
Bid Date: Aug 10 2023
West Bath, ME
Bid Date: Mar 06 2023
West Bath, ME
Bid Date: Aug 24 2022
West Bath, ME
Bid Date: Jan 15 2020
West Bath, ME
Bid Date: Mar 23 2022
West Bath, ME
Bid Date: Mar 23 2022
West Bath, ME
Bid Date: Jul 07 2022
West Bath, ME
Bid Date: Jun 23 2022
West Bath, ME
Bid Date: May 26 2022
West Bath, ME
Bid Date: Apr 17 2019
Biddeford, ME
--
Biddeford, ME
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.