Demolition, site work and renovation of a municipal facility in Saint Paul, Minnesota. Completed plans call for the demolition of a municipal facility; for the renovation of a municipal facility; and for site work for a municipal facility.

Upgrade Door Hardware on Perimeter Doors, Capitol Building. Responding company has completed as a Prime Contractor, the work for at least three (3) contracts which have achieved Substantial Completion since January 1, 2018, for construction in a public, government building with experience in historic preservation of finishes and materials. Each of these contracts MUST have had a construction value of $500,000 or greater. Project Manager and Job Superintendent responsible for this project EACH has had at least five (5) years of experience with public building projects similar in scope and value to this project. Each of these contracts must have had a construction value of $500,000 or greater. This Project has a 4% Targeted Group, Economically Disadvantaged, Veteran-Owned Small Businesses (TG/ED/VO) subcontracting goal. The TG/ED/VO subcontracting goal will not be a consideration in determining the lowest responsible Prime Contractor. Est. Value: $ 1,912,990.50. Est. Completion Date: Dec. 31, 2024. Site Address: 75 Rev. Dr. Martin Luther King Jr. Blvd. A. The work will be done under one prime contract that includes: General, Demolition, Electrical, Security, and Smoke Evacuation Systems construction. B. The following summary is a general guide to the scope of work. It should not be construed as a detailed list of work included in the contract. 1. Replacement of door hardware at existing, exterior doors, including associated electrical and low voltage wiring and devices. 2. Salvage of existing hardware components to owner. 3. Demolition and replacement of electrical wiring back to associated panels. 4. Removal of in-floor operators and waterproofing and infill of associated floor cavities. 5. Stone, copper and plaster repairs at device removal and locations for new conduit. 6. Finish carpentry and repairs at enclosures for door operators. 7. Interior painting at affected surfaces. Question Deadline 07/12/2024 at 5:00 PM CT

Bid Results

Municipal

$980,300.00

Public - State/Provincial

Demolition, Renovation, Site Work

51

11

9

6

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
87
Bidding Soon
790
All Active Projects
329
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

September 17, 2024

img_map_placeholder

75 Rev Dr Martin Luther King Jr Boulevard., Saint Paul, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.