BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 12, 2025 at 7:00 PM

Updated December 13, 2025

Demolition, site work, paving and new construction of a bridge / tunnel in Slater, Wyoming. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Description: Bridge replacement; Involving erecting and installing steel, placing concrete and road base, machine placing riprap, laying asphalt pavement, performing excavation, placing temporary traffic control measures, and removing one steel bridge at RM 3.29 on WYO 314 at the Bridge over Chugwater Creek in Platte County. Est. Completion Date: Nov.30, 2026 Pre-Qualification: Yes County : Platte WYDOT - Call No. 003 - District 2 Bridge Replacement (Bridge Over Chugwater Creek)

Award

Bridges / Tunnels

$3,249,808.00

Public - State/Provincial

Demolition, New Construction, Paving, Site Work

173

6

5

Subscribe For Documents

35 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
21
Bidding Soon
343
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.