Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a mixed-use development in Holyoke, Massachusetts. Conceptual plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.
Contractors licensed to practice in the State of Massachusetts are requested to submit proposals for infrastructure improvements to enhance an existing river access point at Jones Ferry in Holyoke, MA. This project is funded by the American Rescue Plan Act of 2021 and administered by the Connecticut River Conservancy to respond to a significant increase in use at the Jones Ferry river access point resulting from the COVID pandemic. The Jones Ferry project includes an extension of an existing paved boat ramp; removal of submerged construction and paving debris; removal of invasive brush and planting of native plants; installation of a new anchoring system for upgraded dock system; and construction of an ADA- compliant/universally accessible river viewing platform. Separate RFP issued June 2024 for installation of ADA viewing Platform and Pathway. All work to be completed for this project requires work in and around the Connecticut River and river floodplain. Environmental permits have been filed for this project prior to contractor selection and all work must be done within the specification set forth to protect the riparian and instream habitats, and to protect against undue erosion of the riverbank. This proposal is seeking responsesfor all of the following project components: - extension of/ or replacement of an existing paved boat ramp - removal of submerged construction and paving debris - installation of a new anchoring system for the upgraded dock system. The engineering site plan for the project, included below, contains all the project specifications. Respondents will need to review the engineering site plan for exact specifications of the work to be completed prior to submitting a proposal. Key points of the scope work include: removal of subgrade material existing at end of boat ramp and installation of new subgrade bedding material and 6' anchored precast v-groove cement block; removal and proper disposal of existing concrete debris and related steel piping on shoreline surrounding boat ramp; restoration of riverbank at grade and installation of erosion control mechanisms; installation of three new class-A 12" wood marine pilings to anchor upgraded dock system, and; removal and proper disposal of existing concrete, and installation of erosion control mechanism. All work will be required to be completed during naturally low seasonal water levels (July- October annually). Vegetation removal work along the riverbank, dock installation and viewing platform construction are being separately awarded and will be done in coordination with the successful bidder on this project. Contractors are invited to bid on both projects in separate bids if they so desire. Environmental permitsfor this project were issued February 2024, prior to any work being completed at the project site. No work is to be done outside the permit conditions set forth by the permitting authorities. Permits for this project include Notice of Intents file with the City of Holyoke Conservation Commission, Natural Heritage and Endangered Species Program, and Massachusetts Department of Environmental Protection; Chapter 91 Waterways License, and; Army Corps of Engineers Self-Verification Notification. A question-and-answer period for this project has been designated to span through July 12th, 2024 after which time all questions received will be distributed in writing to all prospective bidders. Please send all questions to gchevalier@ctriver.org. Owner rights: The Connecticut River Conservancy reserves the right to reject any and all proposals which do not comply with these instructions.
Conceptual
Sidewalks / Parking Lot
$400,000.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 21, 2025
Jones Ferry Rd, Holyoke, MA
Related To This Project
Holyoke, MA
Bid Date: Jun 28 2024
Holyoke, MA
--
Holyoke, MA
Bid Date: Aug 28 2024
Holyoke, MA
Bid Date: Aug 21 2024
Holyoke, MA
Bid Date: Aug 01 2024
Holyoke, MA
Bid Date: Aug 23 2024
Holyoke, MA
Bid Date: Aug 23 2024
Holyoke, MA
Bid Date: Aug 30 2024
Holyoke, MA
Bid Date: Sep 04 2024
Holyoke, MA
Bid Date: Jun 27 2024
Holyoke, MA
Bid Date: Jun 27 2024
Holyoke, MA
Bid Date: Jun 24 2024
Holyoke, MA
Bid Date: Jun 26 2024
Holyoke, MA
Bid Date: Jun 21 2024
Holyoke, MA
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.