BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Tucson, Arizona. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Scope of Work 4,366 linear feet +/- of a new 8-inch non-potable waterline. The new waterline will provide water service to the Pascua Yaqui Wellness Center and park. o Non-potable waterline work includes clearing, trenching and backfill, connecting to the existing 16 PVC (owned by the PYT) by tapping sleeve and valve, new non potable PVC and DI waterline, valves, boxes, fittings, air release valves, removal and disposal of excess materials, water markers, reconstruction of existing stabilized earth (used as pavement), removal of sidewalk, new sidewalk, and other miscellaneous work as shown in the project plans and included in the bid tabulation. The work specified shall be completed within 240 working days (excluding weekends and federal holidays) CAP-fall-outage maintenance and repair window: October 1, 2024, to November 30, 2024 Casino / Golf Course water disruption window January 1, 2025, to February 15, 2025 This project is located within Sections 23 and 24 of Township 15 South, Range 12 East Gila and Salt River Meridian, Pima County, Arizona. This project is entirely located within the Pascua Yaqui Tribe (PYT) Reservation, Tucson Arizona.

Post-Bid

Water / Sewer

$1,953,206.00

Public - Federal

Paving, Site Work

32

7

4

2

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
28
Active Projects
13
Bidding Soon
293
All Active Projects
118
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 7, 2024

October 1, 2024

img_map_placeholder

Multiple Locations, Tucson, AZ

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.