Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published July 11, 2024 at 8:00 PM

Updated July 12, 2024

Site work and paving for a mixed-use development in Milwaukee, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Construction of, variable thickness asphaltic concrete pavement, variable Thickness concrete base, 6" and 8" concrete base, pavement grinding, 7" concrete Driveways, concrete curb and gutter, 5" concrete walks, pavement grinding, Repair pavement joints and cracks, installation of conduit, fiberglass/polymer Concrete pull boxes, and other electrical appurtenance, gravel filling, Concrete removals, pavement marking, sewer work, water work, tree clearing & Grubbing, CUC adjustments, etc Time for Completion: All work on this contract shall be completed by October 31, 2024. Liquidated Damages, per diem: $1,000.00/Day The SBE requirement for this project is 25% of the contract base bid. The SBE Compliance Plan (Form A) must be submitted with the bid and is an element of bid responsiveness. SBE certificates must be submitted with the Form A. Incomplete SBE Compliance Plans (Form A) or inaccurate SBE Compliance Plans will not be accepted and will render the bid unresponsive. For a complete listing of City of Milwaukee certified SBE firms, see the Office of Equity and Inclusion's (OEI) website at https://milwaukee.diversitycompliance.com/. If there are any questions regarding SBE firms, please contact the OEI office at 414-286-5553. Bid Security Required: Bond, Certified Check, Cashier's Check or Cash to accompany bid: 10% of the Contractor's Base Bid No work in the public right-of-way will be permitted to occur during the Republican National Convention (RNC) from July 14, 2024 through July 20, 2024. All excavations must be temporarily restored or covered with a steel plate to allow through traffic or ADA compliant pedestrian access (Permits could be denied based on coordination with the Secret Service prior to July 14, 2024

Bid Results

Roads / Highways

$495,482.00

Public - City

Paving, Site Work

9

3

2

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
323
Active Projects
149
Bidding Soon
2,435
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 8, 2024

Project location map

Multiple Locations, Milwaukee, WI

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed