Renovation of a municipal facility in Louisville, Kentucky. Completed plans call for the renovation of a municipal facility.

Description and location of Project: The principal features of the Work to be performed under this Contract include, but are not limited to the following: 1. Repair of concrete beams and overhead slab in Area E basement, including strengthening of the existing beams with CFRP wrap. 2. Construct CMU containment wall and fill the west side of Area E basement with cellular fill. 3. Install vertical reinforcing in existing exterior CMU walls at Areas B, D, F, and G, which includes grouting the reinforced cells and dowelling into the existing wall foundations. 4. Install steel braces at top of existing exterior CMU walls at Areas B, D, F, and G and install adhesive anchors along the length of the steel braces. 5. Protection of stored materials from dust, debris, and weather. 6. Contractor and his/her subs shall comply with OSHA and MSD safety requirements (See Drawings) at all times any work is done at site. Msd supplier diversity minority and woman business enterprise program policy and Procedures manual (mbe/wbe program) - for construction contracts $200,000 and greater For minority business enterprise (mbe) and woman business enterprise (wbe) subcontracting participation. Effective june 1, 2020, msd has adopted and implemented the msd supplier diversity minority and woman business enterprise program Policy and procedures manual (mbe/wbe program), modifying the mbe and wbe participation goals on construction services And construction-related services, in accordance with the msd disparity study (study). The study provided the factual predicate for MSD to establish new MBE and WBE goals in MSD contracting. The MSD MBE\WBE Program subcontracting goals are listed below: If selected as applicable below, the Contractor must subcontract at least 18.0% of the total amount of the Contract Bid price to certified African American minority-owned businesses, at least 2.0% of the total amount of the Contract Bid price to certified Asian-Indian American minority-owned businesses, and at least 15.0% total amount of the Contract Bid price to certified Caucasian Female businesses. If the Contractor is unable to meet the goals, they must demonstrate adequate "GOOD FAITH EFFORTS" in accordance with the MSD Supplier Diversity Minority and Woman Business Enterprise Program Policy and Procedures Manual (MBE/WBE Program) - see MSD MBE/WBE Program - Construction Subcontracting Goal Documents and Forms at online. The MSD MBE/WBE Program is effective June 1, 2020. If selected as applicable above, the goals are as follows: 18.0% MBE - African American, 2.0% MBE - Asian-Indian American and 15.0% WBE - Caucasian Female participation respectively required for this project. MBE and WBE businesses are encouraged to bid on this project as a prime contractor. Questions Due Date: Jul 18th 2024, 11:00 AM EDT All inquiries and questions prior to the bid opening shall be directed, in writing, to MSD's designated web portal at online Questions received less than five days prior to the date for opening of bids may not be answered. Only answers by formal written Addenda posted on MSD's designated web portal will be binding. Oral and other interpretations or clarifications will be without legal effect. All inquiries and questions between the bid opening and the contract awarding shall be directed, in writing, to MSD's Chief Engineer, David Johnson, P.E. Community benefits program : yes The contract will be awarded on an evaluated basis, subject to the approval of the msd board. Msd reserves the right to reject any or all bids or waive any informality in any bid. The Engineer's Construction Cost Estimate for this project is between $ 2,000,000.00 and $ 5,000,000.00 . *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Bid Bond in the amount of 7.5% of the Total Bid

Bid Results

Municipal

$3,470,000.00

Public - County

Renovation

22

14

19

5

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
101
Active Projects
33
Bidding Soon
928
All Active Projects
378
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 15, 2024

October 14, 2024

img_map_placeholder

3050 Commerce Center Pl, Louisville, KY

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.