BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Miami, Florida. Completed plans call for the renovation of a parking garage; and pre-engineered storage facility.

SCOPE OF WORK: The Scope of Work consists of, but is not limited to, furnishing all materials, labor, services, supervision, tools, equipment, and supportive ancillary efforts necessary for a licensed Fire Sprinkler Contractor to replace the existing deteriorated sprinkler systems and install new sprinkler systems throughout Port Miamis Shed B, Shed E, Shed G, and Parking Garage J. After the new sprinkler systems are operational, the existing deteriorated sprinkler systems shall be completely demolished. SBE - SERVICE: 3.07% LICENSE REQUIREMENT: Fire Protection Systems The project consists of, but is not limited to: 1. Completion of new Fire Sprinkler system in each building shall comply with the latest version of the National Fire Protection Association (NFPA), Florida Fire Prevention Code. 2. The new systems for Sheds B, G, E, and Parking Garage J shall be protected throughout by a fully automatic wet pipe sprinkler system designed in accordance with the latest edition of the NFPA 13, Automatic Sprinkler System Handbook, requirements. The systems shall be hydraulically designed. 3. Water Velocity in the sprinkler piping shall not exceed 20 feet per second and a 10% pressure safety factor shall be required. If existing system does not meet the requirements, it will be discussed with the awarded contractor at the design stage. 4. The spare head sprinkler cabinet and Hydraulic Design Data Chart shall be installed next to the fire riser. 5. The existing fire sprinkler system shall remain active, and the new system shall be installed next to the existing system. The minimum height is to match existing height or higher. Once the new system is installed, scheduling the changeover shall be coordinated with the PortMiami representative. 6. Upon completion of the shutdown changeover, all Fire sprinkler piping and hangers shall be completely removed. No portion of the system shall be abandoned in place. Concrete anchors for threaded rod or supports, will be allowed to remain. 7. New Fire Sprinkler systems shall be properly supported as per the NFPA 13 requirements. 8. All above ground sprinkler piping shall be FM approved Schedule 40 carbon steel, electric resistance welded, ASTM A53. There is no FM number available for this project. 9. There shall be 6 phases for each shed. Parking Garage J phases will not be needed if work is preformed between August and October 2025. All phase coordination shall be between the contractor, PortMiami Construction Manager, and the user group for each shed. 10. Allow 14 days between phases to allow the tenant to empty the next area in for bidding purposes. 11. If existing system needs to be turned off and fire watch needed, the contractor will be responsible for coordination and cost. 12. Provide galvanized pipe were exposed outdoors. Sprinklers exposed outdoors shall be corrosion resistant, with Teflon coating. All piping in the parking garage is to be considered exposed outdoors. 13. Interior Fire Sprinkler piping shall always be protected and maintained clean and free of rust and corrosion. 14. Installation of standpipes and hose systems shall be in accordance with the latest edition of the NFPA 14, Standard for the Installation of Standpipe and Hose Systems, and shall be provided as required by the latest edition of the NFPA 307, Standard for the Construction and Fire Protection of Marine Terminal Piers and Wharves. 15. If any new hole are required for the new Fire Sprinkler system, the existing system may be removed to utilize the existing holes providing the remaining system is active. The Contractor properly seal all holes. 16. All hangers, Unistrut, Unistrut straps, threaded rods, hex nuts, junction boxes, anchors, ETC shall be stainless steel. 17. All Fire alarm scope shall be performed under the Fire sprinkler contractor, including all costs, plans, permitting, testing, and installed by a licensed and authorized Fire Alarm contractor. 18. All areas impacted by the existing Fire Sprinkler removal shall be properly patched, sealed and fire-stopped when applicable. 19. Upon completion of the installation of each Fire Sprinkler system, functional tests following approved testing standards shall be performed in the presence of the Authority Having Jurisdiction (AHJ) and the Port Miami representatives for the Fire Alarm system. EXPERIENCE REQUIREMENT: The Prime Contractor and/or Key Personnel must have successfully completed the construction and/or rehabilitation of a minimum of three (3) fire protection systems replacements within the last ten (10) years; one (1) project within the last five (5) years. REQUESTS FOR INFORMATION (RFIS): All requests for clarification of a RPQ must be submitted in writing by Thursday, October 17, 2024, by noon. Written communications must be in the form of e-mail addressed to Ivonne Andres at sprfi@miamidade.gov with a copy to the Clerk of the Board at clerkbcc@miamidade.gov

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$4,009,211.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
42
Bidding Soon
1,088
All Active Projects
474
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

November 4, 2024

December 4, 2024

img_map_placeholder

1015 N America Wy, Miami, FL


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.