Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 28, 2024 at 8:00 PM
Updated July 22, 2024
This is a service / maintenance or supply contract in Miami, Florida. Contact the soliciting agency for additional information.
ESTIMATED COST: $320,000.00 LICENSE REQUIREMENT: Electrical Contractor SCOPE OF WORK: This is a non-exclusive open work order contract for miscellaneous electrical services/repairs at various locations/buildings at Miami-Dade County Seaport Department. All work order pricing shall be based on unit prices received at the time of bidding and shall be issued on individual work orders. The lowest responsive and responsible bidder shall be awarded a contract with a maximum contract value not to exceed $325,000.00 (Base $320,000.00 & Dedicated Allowance $5,000.00). Based on these parameters, the Contractor shall be required to provide a Payment and Performance Bond. The Contractor shall furnish all materials, labor, services, supervision, tools, equipment, and all other items necessary to furnish and install, repair, alter, add to, replace, or change miscellaneous items to address electrical deficiencies identified during ongoing 30/40-year recertification throughout Port Miami. Examples include but are not limited to corroded or damaged equipment, conduits, wiring, equipment relocation, circuit tracing, identification, and other items deemed necessary by the Miami-Dade County Seaport Department. All work shall comply with all plans, specifications, codes, laws and regulations as applicable. LICENSE: Contractors must hold a valid license required to perform work in the following trade: Electrical up to 600V. Note: Pursuant to the requirements of Section 10-3 of the Code of Miami-Dade County, selected Contractors must possess a valid, current, and active State of Florida and/or Miami-Dade County contractor's license issued by the County's Construction Trades Qualifying Board, and which is consistent with the requirements of their respective trade and the scope of work. Requests for Information: All requests for clarification of an RPQ must be submitted in writing by Wednesday, July 12, 2024, by 12:00 PM. Written communications must be in the form of an e-mail addressed to Frank Ramirez at sprfi@miamidade.gov with a copy to the Clerk of the Board at clerkbcc@miamidade.gov and a copy to Kyle.Kincaid@miamidade.gov The email must state each participant's name, email address, and phone number as well as their company's name. Failure of a bidder to attend and sign the attendance sheet at a mandatory Pre-Bid Conference will result in the Contractor's bid being rejected. If the bidder does not arrive on time for the Pre-Bid Conference, there is no guarantee that he/she will be allowed to attend.
Post-Bid
Water / Sewer
$320,000.00
Public - County
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 19, 2024
August 19, 2024
Multiple Locations, Miami, FL
Related To This Project
Miami, FL
Bid Date: Aug 29 2024
Miami, FL
Bid Date: Aug 29 2024
Miami, FL
Bid Date: Aug 22 2024
Miami, FL
Bid Date: Aug 20 2024
Miami, FL
Bid Date: Sep 10 2024
Miami, FL
Bid Date: Aug 27 2024
Miami, FL
--
Miami, FL
Bid Date: Aug 22 2024
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
--
Miami, FL
Bid Date: Aug 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
