BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 29, 2024 at 8:00 PM

Updated July 30, 2024

Site work, paving and outdoor lighting for a mixed-use development in Spring Creek, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; and sidewalk / parking lot.

Type: District-3 Contract Cost Range: R29 ($9,550,000.01 to $11,500,000) Funding Type: Federal Opening Office: Carson City County(s): Elko Enterprise Goal: 5.25 % Location: SR 227 from 0.393 miles west of SR 228 to Lower Lamoille Road Work Description: construct a roundabout at Boyd Kennedy Road and safety speed management countermeasures Project Manager: Christopher Deal Route(s): SR 227 Milepost(s): EL 6.893 to 10.000 Contract Days: 90 (working) Liquidated Damages: $6,500.00 This project has a Disadvantaged Business Enterprise (DBE) Goal of 5.25% Location Description: Sr 227, Elko County, From 0.393 Miles West of Sr 228 to Lower Lamoille Rd; Mp El 6.50 to Mp El 10.00 NVDOT - Construct a Roundabout at Boyd Kennedy Road and Safety Speed Management Countermeasures *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. MBE (9.2%), WBE (6.9%), DBE (5%)

Bid Results

Roads / Highways

$11,058,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

213

10

11

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
8
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

September 23, 2024

Project location map

NV-227 & Boyd-Kennedy Rd, Spring Creek, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.