BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2024 at 8:00 PM

Updated August 31, 2024

Site work, paving and outdoor lighting for a mixed-use development in Fish Springs, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; for outdoor lighting for a road / highway; bridge / tunnel; bridge / tunnel; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Type: District-2 Contract Cost Range: R36 ($34,000,000.01 to $41,000,000) Funding Type: Federal Opening Office: Carson City County(s): Douglas Enterprise Goal: 7.8 % Location: US 50 from the CA/NV Stateline to Kings Canyon Road Work Description: cold mill, place plantmix bituminous surface with open grade, ITS, hydraulic, and safety improvements Project Manager: Brian Deal Designer: Tyler Schmaling Resident Engineer: Freeman, Jeffrey Route(s): US 50 Milepost(s): DO 0.00 to DO 13.26 Contract Days: 180 (working) Liquidated Damages: $9,000.00 This project has a Disadvantaged Business Enterprise (DBE) Goal of 7.80% Location Description: Us 50, Douglas County, From the Ca/nv Stateline to Kings Canyon Rd, Mp Do 0.00 to Mp Do 13.26 NVDOT - Cold Mill, Place Plantmix Bituminous Surface With Open Grade, ITS, Hydraulic, and Safety Improvements - US 50 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$48,200,000.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

399

12

52

3

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
18
Active Projects
0
Bidding Soon
204
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 8, 2024

October 7, 2024

Project location map

US-50, Fish Springs, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.