Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published September 24, 2024 at 8:00 PM

Updated September 25, 2024

Site work for a bridge / tunnel in Mission, British Columbia. Completed plans call for site work for a bridge / tunnel.

Permanently fix faulty joints at Pier S8, S5, N5 and N8. Work consists of removal of existing joint blockouts, armoring and seal. Reinforcing / formwork installation and cast-in-place concrete pour for joint blockouts. Documents can be obtained from www.bcbid.gov.bc.ca. Construction documents for this project are copyright of the Province of British Columbia.

Award

Bridges / Tunnels

$1,767,206.00

Public - State/Provincial

Site Work

6

13

3

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
291
Active Projects
116
Bidding Soon
2,014
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

September 1, 2024

Project location map

Multiple Locations, Mission, BC

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed