Published August 21, 2024 at 8:00 PM

Updated August 22, 2024

Site work for a water / sewer project in Papillion, Nebraska. Completed plans call for site work for a water / sewer project.

Sanitary Sewer - Section Iv for Sanitary and Improvement District 312, Sarpy Counfy, Nebraska Construct Sanitary Sewer Tap Construct 8" Pvc Sanitary Sewer Pipe Construct 6" Pvc Sanitary Sewer Pipe Construct 8" Diameter Drop Connection Construct 6" Sanitary Service Riser Construct 54" I.d. Sanitary Manhole (20) Construct External Frame Seal Construct Aggregate Bedding for Trench Stabilization (3" Clean) Install Geotextile Fabric for Trench Stabilization Install Silt Fence Quantity 5 4,327 5,760 15 105 266 20 Unit Ea Lf Lf Vf Vf Vf Ea 200 Tn 1,000 3,500 Sy Lf the Amount of the Engineer's Estimate of the Cost of Said Improvements (Exclusive of Engineering, Fiscal, Legal, Interest, Easement Acquisition, and Miscellaneous Costs) is $838,800.00. Must Be Accompanied by an Original Bid Bond or a Certified Check in the Amount Not Less Than $41,940.00 Made Payable to the Treasurer of Sanitary and Improvement District 312 as Security That the Bidder to Whom the Contract May Be Awarded Will Enter Into a Contract to Build the Improvements in Accordance With This Notice to Contractor and Will Give a Contract and Maintenance Bond in the Amount of 100% of the Total Contract Price, All as Provided in the Specifications. Bid Bonds Must Be Executed by a Duly Licensed Corporate Surety. Checks Accompanying Proposals Not Accepted Shall Be Returned to the Bidders. No Bidder May Withdraw His Proposal for a Period of Sixty (60) Days After Date Set for Opening of Bids. None of Which Will Be Refunded, Sanitary and Improvement District 312 of Sarpy County, Nebraska, Reserves the Right to Reject Any or All Bids Received and to Waive Informalities and Irregularities. Sanitary and Improvement District 312 of Sarpy County, Ne.

Award

Water / Sewer

$595,993.00

Public - State/Provincial

Site Work

11

5

2

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
93
Bidding Soon
961
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

August 16, 2024

Project location map

Multiple Locations, Papillion, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.