Renovation of a transportation facility in Bolingbrook, Illinois. Completed plans call for the renovation of a transportation facility.

As of September 25,2024, this project has not yet been awarded. A timeline for award has not yet been established. Village of Bolingbrook Clow International Airport (1c5) Partial Reimbursement for Locally Constructed 2 Box Aircraft Hangars Illinois If you have any questions concerning this report or if we may be of further service, please contact us Wang Engineering, a Terracon Company The Bid sum shall be for scope of work defined in this document. When equipment and manufacturing products are included in the bidding documents, the Bid sum shall be for the products by manufacturers named within the specification or addenda. Requests for substituting other manufacturers will be considered within but no later than twenty (20) consecutive calendar days after the Notice to Proceed and not before. Should a conflict be discovered within the Contract Documents, the CONTRACTOR shall be deemed to have estimated the highest quality way of doing the work unless he shall have asked for and obtained a decision, in writing, from the OWNER before entering into this Contract The contractor shall be responsible for cleaning and maintaining all terminal and airport access roads and using a vacuum-type mechanical sweeper on all pavements and adjacent pavements utilized during the construction process when material is tracked onto the existing pavement. The Contractor shall have a sweeper on site and always maintain all pavements clear of dirt and debris or as requested by the Resident Engineer. If the Contractor fails to comply with the Standard Specifications, Contract Plans or these Special Provisions concerning traffic control, all construction activities shall cease, and the Contractor will be required to correct the deficiencies to the satisfaction of the Resident Engineer and Owner. The Contractor shall be responsible for supplying, maintaining, and moving all barrels and/or barricades required for the staged construction as shown and detailed in the contract plans. Questions on the Project Documents shall be emailed to both Junaid Yahya junaid.yahya@kimley-horn.com and Luke Burlingame luke.burlingame@kimley-horn.com - RE: 1C5-5124 Bolingbrook Hangars. The deadline for any questions will be at the end of business on August 27th, 2024. Answers to all questions will be addressed in an Addendum and issued to all plan holders. Pre-Bid Meeting - Join on a video conferencing device Tenant key: 340760667@t.plcm.vc Video ID: 113 871 816 8

Post-Bid

Transportation Terminals

$200,000.00

Public - City

Renovation

66

34

16

2

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Reference Standards, Temporary Facilities and Controls, Temporary Utilities, Temporary Fire Protection, Temporary Construction, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Maintenance Data, Project Record Documents, Demonstration and Training, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Precast Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Joists, Cold-Formed Metal Framing, Metal Fabrications, Metal Floor Plates
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Exterior Insulation and Finish Systems, Roofing and Siding Panels, Roof and Wall Specialties and Accessories, Roof Specialties, Reglets, Fire and Smoke Protection, Firestopping
Division 08 - Openings

Division 08 - Openings

Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Special Function Doors, Hangar Doors, Windows, Aluminum Windows, Bronze Windows, Stainless-Steel Windows, Steel Windows, Wood Windows, Hardware, Door Hardware, Glazing, Glass Glazing
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories
Division 12 - Furnishings

Division 12 - Furnishings

Furniture, Seating, Chairs
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Lifts
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Plumbing Insulation, Plumbing Piping Insulation, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Plumbing Equipment, Electric Domestic Water Heaters, Fuel-Fired Domestic Water Heaters, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Testing, Adjusting, and Balancing for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, Sequence of Operations for HVAC Controls, HVAC Air Distribution, HVAC Ducts and Casings, HVAC Fans, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Convection Heating and Cooling Units
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Grounding and Bonding for Electrical Systems, Medium-Voltage Electrical Distribution, Medium-Voltage Transformers, Low-Voltage Electrical Distribution, Low-Voltage Transformers, Switchboards and Panelboards, Panelboards, Facility Electrical Power Generating and Storing Equipment, Lighting, Interior Lighting, Emergency Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm, Electronic Monitoring and Control, Electronic Detention Monitoring and Control Systems
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Fill, Backfill, Compaction, Embankments, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Fuel Distribution Utilities, Natural-Gas Distribution, Natural-Gas Piping
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Instrumentation and Control for Process Systems, Process Control Auxiliary Devices
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Lifts
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
292
Active Projects
193
Bidding Soon
2,174
All Active Projects
1,048
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 5, 2024

October 7, 2024

img_map_placeholder

130 Clow International Pkwy, Bolingbrook, IL

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Bolingbrook's Clow International Airport (1C5) Partial Reimbursement for Locally Constructed 2 Box Aircraft Hangars

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.