BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Morton, Washington. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Morton Cherry & Kosmos Water Main Improvements & Overlay. A contract will be awarded, or all bids rejected within 60 days after the bid opening. This project shall be physically completed within ***$$ 55 $$*** working days The Contractor shall commence onsite work on or before August 19th, 2024 Technical inquiries regarding the project should be directed to the City of Morton consulting engineer, Gibbs & Olson, Inc., 1157 3 rd Avenue, Suite 219, Longview, WA 98632 (Phone 360.425.0991, Fax 360-423-3162) All bid proposals shall be accompanied by a bid proposal deposit in cash, certified check, cashier's check, or surety bond in an amount equal to five percent (5%) of the amount of such bid proposal. Should the successful bidder fail to enter into such contract and furnish satisfactory performance bond within the time stated in the specifications, the bid proposal deposit shall be forfeited to the City of Morton. Est. Value: $ 1,260,000.00. Description: The improvements for which bids will be received is described below: Schedule A: Improvements include installation of approximately 2,938 linear feet of 8-inch DI water main, abandonment of existing 4-inch tar dipped steel water main, fire hydrants, water services, valves, fittings, appurtenances and associated restoration. Schedule B: Improvements include approximately 3,350 linear feet of 20-foot-wide roadway in two segments; 2,800 linear feet on Cherry Lane, Kosmos Lane, Tilton Way and Crystal Way, and 550 linear feet on Collar Avenue from First Street to Kittles Way in Morton, Washington. These improvements include full depth pavement reclamation, HMA pavement, driveway repair, roadside restoration and striping.

Bid Results

Roads / Highways

$1,273,251.00

Public - City

Paving, Site Work

23

6

4

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
30
Bidding Soon
818
All Active Projects
357
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 10, 2024

August 19, 2024

img_map_placeholder

Multiple Locations, Morton, WA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.