Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 1, 2024 at 8:00 PM

Updated August 2, 2024

Renovation of a municipal facility in Chicago, Illinois. Completed plans call for the renovation of a municipal facility.

Repair Garage Door Lintel Bearings and Replace Masonry. Less than $500,000. DESCRIPTION: Repair of garage door lintel bearings and replacement of clay masonry columns. CONTRACT TIME: Refer to Articles 00 72 10 and 01 32 00 of the Standard Documents for Construction. The contractor shall complete all work through Substantial Completion in accord with the contract within 90 consecutive calendar days from the date of the Authorization to Proceed and shall complete all remaining work in accordance with the contract (Final Acceptance) within 30 consecutive calendar days from the date of Substantial Completion.

Bid Results

Municipal

$198,750.00

Public - City

Renovation

8

11

10

4

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
564
Active Projects
224
Bidding Soon
4,095
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed