BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 26, 2024 at 7:00 PM

Updated November 27, 2024

Site work and paving for a mixed-use development in Kingston, Ontario. Design plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Riverside Central Park Pedestrian Bridge and Pathway construction. Location: approximately 30 m North of Faircrest Boulevard, in Kingston, Ontario. TIMELINE: An RFP for engineering design has been awarded. Design is ongoing. Construction of these improvements are planned for summer of 2025 and to be completed by fall of 2025. *Budget is unreleased.

Design

Bridges / Tunnels

$400,000.00

Public - City

Paving, Site Work

Our team is requesting plans for this project.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
138
Active Projects
87
Bidding Soon
907
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 18, 2025

Project location map

30 Faircrest Blvd, Kingston, ON

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.