BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 13, 2024 at 8:00 PM

Updated August 14, 2024

Site work and paving for a mixed-use development in North Las Vegas, Nevada. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The project work consists of furnishing of all labor, materials, material delivery, transportation and all associated services for safety upgrade on Camino El Norte, from Craig Road to Ann Road (CIP # 10491-23). This work generally consists of pedestrian safety and aesthetic enhancements within the median along Camino al Norte, from Craig Road to Ann Road. The project roadway distance is approximately 1.75 miles. The Project shall be completed within 100 consecutive calendar days from the date specified in the Notice to Proceed, which time shall include resolution of all punch list items, final cleanup and demobilization. The estimated monetary range of the project is: $1,900,000 to $2,100,000. Question Deadline 07/11/2024 at 12:00 PM PT Any question should be submitted to James Hackman, Senior Engineer, City of North Las Vegas, via email at hackmanj@cityofnorthlasvegas.com. All questions must be submitted in writing and received. A Pre-Bid Conference will not be held for this project. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Roads / Highways

$1,999,500.00

Public - City

Paving, Site Work

93

14

2

2

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
51
Active Projects
4
Bidding Soon
420
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 24, 2024

September 24, 2024

Project location map

Camino Al Norte, North Las Vegas, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.