BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a bridge / tunnel in Shamrock, Saskatchewan. Completed plans call for site work for a bridge / tunnel.

The Wiwa Creek Conservation & Development Area is tendering a Provincial Disaster Assistance Program project. The Wiwa Creek C&D project will require an Engineer and a Contractor to complete the replacement and repairs to the Saskatchewan Water Security approved cement control structure on the Wiwa Creek on the SE 2-13-6 W3 in the RM of Shamrock. The structure is located south west of the Village of Shamrock. The project needs to be replaced to its original specifications. In the spring of 2023 during a quick thaw the spring runoff damaged the control structure. Damage included: two 4429 mm x 2705 mm x 55 ft long structural plate arch pipe culverts road embankment acting as dike washed out, 8 m road top, 5 m high, 2:1 slopes on the inlet side, 1:1 side slopes on outlet side 1 m D x 3 m W x 2 m L scour hole formed below south side of concrete headwall Erosion of embankment, 5 locations approximately 0.7 m D x 1 m W x 10 m L each Cathodic Protection Rip rap washed away Here is a list of repairs that are required to return the control structure to operational. The Wiwa Creek C&D are working with a limited budget. In your tender please list a total for the completion of the project and a breakdown of the different repairs required. The PDAP has allotted specific amounts for each repair. Repairs: Remove existing culvert from inside cement headwall only. Extruding culverts have already been removed. Replace culverts - closest size manufactured is 4370 mm x 2870 mm Rebuild road embankment Repair scour hole below concrete headwall Repair erosion areas Install cathodic protection on new culverts - preference for culverts to be coated and eliminate cathodic protection Replace rip rap Pictures of the damaged structure are included under the downloadable documents. For questions, more details, or to meet a Wiwa Creek C&D board member at the site please email Kerri Fortin at kfortin4@hotmail.com The Wiwa Creek C&D will be responsible for the required AHPP permits through the Water Security Agency and will provide the permit to the successful candidate. The owner reserves the right to reject any or all tenders and will not necessarily accept the lowest tender.

Post-Bid

Bridges / Tunnels

$200,000.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1
Active Projects
0
Bidding Soon
12
All Active Projects
3
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 2, 2024

August 19, 2024

img_map_placeholder

Multiple Locations, Shamrock, SK

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.