BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and addition to a conference / convention center in Dallas, Texas. Completed plans call for the addition of a conference / convention center; for the demolition of a conference / convention center; and for site work for a conference / convention center.

As of August 12, 2024, this project is in the conceptual phase. A construction manager has not been selected. The owner plan to issue RFP's to invited bidders around August 21, 2024. It is anticipated the owner will notify selected candidate and begin contract negotiations early October 2024. An architect is expected to be selected by late August 2024. It is anticipated construction will start late 2025. *The closed solicitation has been included below for reference: KBHCCD Master Plan Component 1 Convention Center Expansion West of Lamar Provide Pre-Construction and Construction Services for the Project with a goal delivery date of March 31, 2029, with decommissioning, demolition, and site clearance of the Project by Q4 2030. 1.1 The Basic Services shall include project design review and evaluation, planning for construction mobilization and supervision, construction cost estimating and analysis, project scheduling, and cost-benefit analysis, including, but not limited to, the tasks identified below and Section III. 1.2 CMAR shall communicate and coordinate with the City, the Project Manager, and the City's design team (Design Team) to ascertain the requirements of the Project and shall arrive at a mutual understanding of such requirements with the City. 1.3 CMAR shall provide a preliminary evaluation of the City's schedule and Construction Budget, each in terms of the other. 1.4 CMAR shall coordinate with the Design Team as necessary to deliver the Services and support the schematic design, design development, construction documents, and development of estimated guaranteed maximum price (GMPs). 1.5 CMAR shall perform the Pre-Construction Services as defined in accordance with the applicable standard of care for a CMAR excluding only responsibility for the professional negligence of any licensed engineer or architect in the preparation of the Plans and Specifications (1) Perform an ongoing review of the Architect's programming plan including the size of space, proposed finishes, ceiling heights, building height, exterior finishes, circulation spaces, any necessary ancillary spaces, and any anticipated site work; (i) CMAR shall submit to the Program Manager, at each document review phase, an analysis of the Design Team's program in comparison to the City's approved specifications, including quantified cost and time impacts associated with each variance. Kay Bailey Hutchison Convention Center Dallas (KBHCCD) Master Plan Convention Center Expansion West of Lamar Street Only and Any Related Demolition Associated with Portion of Component 1 - Request for Qualifications for Construction Manager at Risk. Questions Due Date: Jul 15th 2024, 2:00 PM CDT

Post-Bid

Conference / Convention Centers

$1,600,000,000.00

Public - City

Addition, Demolition, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

52 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
360
Active Projects
211
Bidding Soon
4,944
All Active Projects
1,888
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 26, 2024

December 1, 2025

March 31, 2029

img_map_placeholder

650 S Griffin St, Dallas, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.