BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Renovation of an educational facility in San Antonio, Texas. Completed plans call for the renovation of a educational facility.

The Project is generally described as follows: New installs of packaged units for unconditioned gymnasiums. This project also includes demolition of existing heaters, and all general construction, site work, HVAC, electrical, plumbing and all other work as indicated in the contract documents. Scope will include nine (9) schools across the district. All questions concerning this Proposal must be received no later than 2:00 PM, on Wednesday, July 17th, 2024. Inquiries should be identified by title, date, proposal number, and should be submitted and posted to Judson ISD Public Purchase site. Judson ISD will then forward all inquiries to the Architect. Inquiries sent in any other format and/ or any other party will not be considered. WITHDRAWAL OF BID Any Bidder may withdraw his Proposal, by written request, at any time before the scheduled closing time for receipt of Proposals. No bid may be withdrawn for at least sixty (60) days after the date the bids are opened, nor may any bid be withdrawn between the scheduled closing time for receipt of proposals and the time the bids are actually opened. TIME OF COMMENCEMENT AND COMPLETION: The Project must be complete and ready for occupancy not later than September 2025, assuming that the successful Offeror is given notice of its top ranking on or before June 21, 2024. Any proposal must provide for final completion by this date. Alternately, Offerors are asked to submit the number of calendar days required for completion of the Work, if completion of the Work shall be prior to such date. Offerors are advised that The Project is subject to liquidated damages in the amount of $1,250.00 per day for each day's delay in the Substantial Completion of the Work. Offerors are advised that The Project is subject to liquidated damages in the amount of $1,250.00 per day for each day's delay in the Substantial Completion of the Work. Qualified Offerors (General Contractors) may obtain up to two (2) sets of plans and specifications for the deposit indicated above. Mechanical, Electrical, Plumbing Subcontractors, and Structural Steel Suppliers may obtain (1) one set of plans and specifications for the deposit indicated above. Subcontractors & suppliers not indicated and additional sets beyond that indicated above may be purchased. Contact Architectural firm, for information regarding purchase of plan sets. FULL REFUND: Deposits will be returned provided all Contract Documents and Addenda are returned to the Architect complete with all sheets bound in their original order within ten (10) days of the proposal opening. FORFEIT OF DEPOSIT: When the Documents are not returned under the conditions specified, none of the deposit will be returned. However, the Documents shall remain the property of the Owner and must be returned. If the Proposal Documents are returned timely but in poor condition, a reasonable amount for the cost of reproduction will be deducted from the amount of deposit and the remaining balance will be refunded to the General Contractor, Supplier, or Subcontractor.

Award

Educational

$3,800,000.00

Public - County

Renovation

130

29

47

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
66
Active Projects
28
Bidding Soon
2,121
All Active Projects
828
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 25, 2024

September 23, 2024

img_map_placeholder

3635 Candleglenn, San Antonio, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.