BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and new construction of a mixed-use development in Omaha, Nebraska. Completed plans call for the construction of a bridge / tunnel; and for site work for a bridge / tunnel.

Bid Item Description Approximate Quantity Trail and Bridge 1. Clearing and Grubbing - General 1 Ls 2. Clearing and Grubbing Trees Over 9" to 18" Diameter 2 Ea 3. Clearing and Grubbing Trees Over 18" to 27" Diameter 4 Ea 4. Strip, Stockpile, and Respread Topsoil- Established Quantity (125 Cy X 2) 250 Cy 5. Earthwork (Excavation) - Established Quantity 60 Cy 6. Earthwork (Haul in) - Established Quantity 625 Cy 7. Construct Abutment 2 Ea 8. Construct Approach Slab (W/subgrade Prep) 2 Ea 9. Construct 8' X 110' Connector Truss Bridge 1 Ls 10. Furnish and Install Traffic Guard Removable Bollard 2 Ea 11. Construct 6" Pcc Sidewalk (Trail) (W/subgrade Prep) 7,730 Sf 12. Construct 12" C.s.p. 22 Lf 13. Install Silt Fence 800 Lf 14. Cleanout Silt Fence 400 Lf 15. Install Seeding - Type "b" 1.00 Ac Alternate 1 16. Earthwork (Haul in) - Surcharge (Place and Remove) 300 Cy Water Quality Pond a 1. Clearing and Grubbing General 1 Ls 2. Construct, Maintain and Remove Construction Entrance 1 Ls 3. Remove Existing Riprap 1 Ls 4. Strip, Stockpile, and Respread Topsoil (Established Quantity 100 X 2 = 200 Cy) 200 Cy 5. Cleanout Silt Basin 2 Vf (Haul-off Unsuitable - Established Quantity) 1,450 Cy 6. Earthwork Borrow (Haul in - Established Quantity) 1,450 Cy 7. Construct Type "a" Rip-rap Apron 16 Tn 8. Construct Type "a" Rip-rap Ring 23 Tn 9. Install Rolled Erosion Control, Type Ii 1,090 Sy 10. Install Seeding - Type "low Grow Grass" 0.68 Ac 11. Install Seeding - Type "b" 0.30 Ac 12. Install, Maintain and Remove Silt Fence 550 Lf 13. Remove and Replace Sidewalk 90 Sf 14. Remove and Replace Curb and Gutter 15 Lf 15. Area Inlet Modifications 1 Ls Water Quality Pond B 1. Clearing and Grubbing General 1 Ls 2. Construct, Maintain and Remove Construction Entrance 1 Ls 3. Strip, Stockpile, and Respread Topsoil (Established Quantity 165 X 2 = 330 Cy) 330 Cy 4. Cleanout Silt Basin 2 Vf (Haul-off Unsuitable - Established Quantity) 510 Cy 5. Earthwork Borrow (Haul in - Established Quantity) 510 Cy 6. Construct Type "a" Rip-rap Ring 23 Tn 7. Install Rolled Erosion Control, Type Ii 550 Sy 8. Install Seeding - Type "low Grow Grass" 0.28 Ac 9. Install Seeding - Type "b" 0.20 Ac 10. Install, Maintain and Remove Silt Fence 370 Lf 11. Remove and Replace Sidewalk 90 Sf 12. Remove and Replace Curb and Gutter 15 Lf Water Quality Pond C 1. Clearing and Grubbing General 1 Ls 2. Construct, Maintain and Remove Construction Entrance 1 Ls 3. Remove Existing Riprap 1 Ls 4. Strip, Stockpile, and Respread Topsoil (Established Quantity 68 X 2 = 136 Cy) 480 Cy 5. Cleanout Silt Basin 2 Vf (Haul-off Unsuitable - Established Quantity) 840 Cy 6. Earthwork Borrow (Haul in - Established Quantity) 840 Cy 7. Construct Type "a" Rip-rap Apron 16 Tn 8. Construct Type "a" Rip-rap Ring 23 Tn 9. Install Rolled Erosion Control, Type Ii 1,070 Sy 10. Install Seeding - Type "low Grow Grass" 0.48 Ac 11. Install Seeding - Type "b" 0.23 Ac 12. Install, Maintain and Remove Silt Fence 560 Lf 13. Remove and Replace Sidewalk 90 Sf 14. Remove and Replace Curb and Gutter 15 Lf Water Quality Pond D 1. Clearing and Grubbing General 1 Ls 2. Construct, Maintain and Remove Construction Entrance 1 Ls 3. Remove Existing Riprap 1 Ls 4. Strip, Stockpile, and Respread Topsoil (Established Quantity 85 X 2 = 170 Cy) 170 Cy 5. Cleanout Silt Basin 2 Vf (Haul-off Unsuitable - Established Quantity) 720 Cy 6. Earthwork Borrow (Haul in - Established Quantity) 720 Cy 7. Construct Type "a" Rip-rap Apron 16 Tn 8. Construct Type "a" Rip-rap Ring 23 Tn 9. Install Rolled Erosion Control, Type Ii 260 Sy 10. Install Seeding - Type "low Grow Grass" 0.28 Ac 11. Install Seeding - Type "b" 0.26 Ac 12. Install, Maintain and Remove Silt Fence 320 Lf 13. Remove and Replace Sidewalk 90 Sf 14. Remove and Replace Curb and Gutter 15 Lf 15. Area Inlet Modifications 1 Ls Water Quality Pond E 1. Clearing and Grubbing General 1 Ls 2. Construct, Maintain and Remove Construction Entrance 1 Ls 3. Remove Existing Riprap 1 Ls 4. Strip, Stockpile, and Respread Topsoil (Established Quantity 150 X 2 = 300 Cy) 300 Cy 5. Cleanout Silt Basin 2 Vf (Haul-off Unsuitable - Established Quantity) 2,000 Cy 6. Earthwork Borrow (Haul in - Established Quantity) 2,000 Cy 7. Construct Type "a" Rip-rap Apron 22 Tn 8. Construct Type "a" Rip-rap Ring 23 Tn 9. Install Rolled Erosion Control, Type Ii 1,350 Sy 10. Install Seeding - Type "low Grow Grass" 0.88 Ac 11. Install Seeding - Type "a" 0.30 Ac 12. Install, Maintain and Remove Silt Fence 200 Lf 13. Remove and Replace Sidewalk 90 Sf 14. Remove and Replace Curb and Gutter 15 Lf Water Quality Pond F 1. Clearing and Grubbing General 1 Ls 2. Construct, Maintain and Remove Construction Entrance 1 Ls 3. Remove Existing Riprap 1 Ls 4. Strip, Stockpile, and Respread Topsoil (Established Quantity 135 X 2 = 270 Cy) 270 Cy 5. Cleanout Silt Basin 2 Vf (Haul-off Unsuitable - Established Quantity) 1,040 Cy 6. Earthwork Excavation - Established Quantity 1,265 Cy 7. Construct Type "a" Rip-rap Apron 48 Tn 8. Construct Type "a" Rip-rap Ring 26 Tn 9. Install Rolled Erosion Control, Type Ii 1,212 Sy 10. Install Seeding - Type "low Grow Grass" 0.58 Ac 11. Install Seeding - Type "b" 0.45 Ac 12. Install, Maintain and Remove Silt Fence 550 Lf 13. Remove and Replace Sidewalk 90 Sf 14. Remove and Replace Curb and Gutter 15 Lf Water Quality Pond G 1. Clearing and Grubbing General 1 Ls 2. Construct, Maintain and Remove Construction Entrance 1 Ls 3. Remove Existing Riprap 1 Ls 4. Strip, Stockpile, and Respread Topsoil (Established Quantity 60 X 2 = 120 Cy) 120 Cy 5. Cleanout Silt Basin 2 Vf (Haul-off Unsuitable - Established Quantity) 350 Cy 6. Earthwork Borrow (Haul in - Established Quantity) 350 Cy 7. Construct Type "a" Rip-rap Apron 16 Tn 8. Construct Type "a" Rip-rap Ring 23 Tn 9. Install Rolled Erosion Control, Type Ii 540 Sy 10. Install Seeding - Type "low Grow Grass" 0.22 Ac 11. Install Seeding - Type "b" 0.11 Ac 12. Install, Maintain and Remove Silt Fence 240 Lf 13. Remove and Replace Sidewalk 90 Sf 14. Each Bid Shall Be Accompanied, in a Separate Sealed Envelope, by a Certified or Bank Check Drawn on a Bank Whose Deposits Are Insured by the F.d.i.c. Or an Acceptable Bid Bond in the Amount of $40,050.00 and Shall Be Payable Without Condition to Sanitary & Improvement District No. 337 of Sarpy County, Nebraska as a Guarantee That the Bidder, if Successful, Will Execute the Contract and Provide an Acceptable Contract Bond From an Approved Surety in the Amount of 100 Percent of the Contract Price. No Bidder May Withdraw His Bid for a Period of Thirty (30) Days After the Date Set for the Opening of Bids. Upon Approval, the Owner Will Issue Payment to the Contractor in the Amount of 90% of the Contracted Value of the Completed Work as of the End of the Preceding Month, as Recommended by the Engineer. Payment for the Balance Retained Will Be Issued by the Owner Upon Completion of the Work and Approval Thereof by the Owner's Engineer, City or Governmental Approval When Necessary, and Acceptance by the Owner. The Owner Reserves the Right to Reject Any or All Bids and to Waive Informalities. Owner on its own initiative may issue Addenda to clarify, correct, supplement, or change the Bidding Documents. 7.02 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. 7.03 Interpretations or clarifications considered necessary by Engineer in response to such questions will be issued by Addenda delivered to all registered plan holders. Questions received less than seven days prior to the date for opening of Bids may not be answered.

Post-Bid

Roads / Highways

$12,000,000.00

Public - County

New Construction, Paving, Site Work

21

9

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
57
Active Projects
45
Bidding Soon
476
All Active Projects
239
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2024

August 21, 2024

img_map_placeholder

Multiple Locations, Omaha, NE

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.