BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in South Bend, Indiana. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The Project consists of the roadway reconstruction of Fillmore Road from the GM Entrance (approximately 900 feet west of Spruce Road) including shoulders, culverts, ditches, striping, signage, restoration, in accordance with the plans and specifications. Estimated Project Length = approximately 0.38 miles. SAID bids must be accompanied with a Certified Check made payable to St. Joseph County or Bid Bond executed by the bidder and surety company in a sum of not less than ten percent [10%] of the total amount of the bid, together with a non-collusive affidavit as prescribed in Form 96, Revised 2013. The bidder awarded the contract will be required to furnish separate Payment, Performance, and Maintenance Bonds before commencing work. The Payment and Performance Bond shall each remain in effect throughout the entire construction period in an amount equal to the awarded Contract Amount. The required Maintenance Bond shall remain in effect for a period of up to five years from the date of final acceptance in an amount of 10 percent [10%] of the awarded Contract Amount. The bidder's attention is directed to the Affirmative Action Requirements and the Insurance Provisions of the Project. THE Board of Commissioners reserves the right to reject any or all bids or to accept the one which, in its judgment will be to the best interest of St. Joseph County, Indiana. The Board of Commissioners also reserves the right to hold Bids up to 60 calendar days from the receipt of the Bid. Document info : SPECIFICATIONS and/or Plans, if applicable, are available for viewing in the Department of Infrastructure, Planning and Growth Public Works Office, Room 732, County-City Building, 227 W. Jefferson Blvd,, South Bend, Indiana, 46601 PROJECT COORDINATION The Project is located within the Indiana Enterprise Center (IEC) Core Development Area. There are a number of construction projects currently under construction within this area. The Contractor shall coordinate Contractors, Engineers, and Owners as necessary to facilitate the completion of all projects in a timely manner. Current projects within the IEC area are as follows: A. GM Battery Plant Construction B. AWS Data Center Construction C. Water Main Installation D. Niespodziany Ditch Realignment Construction E. SR 2 Rehabilitation Project Additional project information and contact information will be provided via addendum Question Deadline 07/09/2024 at 12:00 PM ET PROJECT DESCRIPTION The Project entails the reconstruction of Fillmore Road from approximately 1,900 feet west of Larrison Blvd. to Larrison Blvd. The work shall include the reconstruction and widening of Fillmore Road from two lanes to four lanes, with an auxiliary lane. The proposed roadway will be constructed utilizing PCCP. Additional improvements will include reconstruction of existing driveway and public road approaches. Temporary HMA pavement will be utilized to transition to the existing Fillmore Road and Larrison Blvd. Additional work includes construction of storm sewer, ditches, temporary retention basins, pavement markings, and maintaining traffic.

Post-Bid

Roads / Highways

$400,000.00

Public - County

Paving, Site Work

44

5

72

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
185
Active Projects
78
Bidding Soon
1,367
All Active Projects
557
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 6, 2024

August 26, 2024

October 15, 2025

img_map_placeholder

Fillmore Rd, South Bend, IN

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.