Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and renovation of a civil project in Rittman, Ohio. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
The proposed work consists of improvements to the existing Rittman Wastewater Treatment Plant (WWTP) to replace failing treatment processes and equipment. This project includes the replacement of the inoperable grit collection system, including, but not limited to the grit pump and grit classifier along with associated piping and electrical improvements. All bidders shall visit the site for the purpose of reviewing the conditions and to resolve any questions in the bid documents. A three-sided structure will be constructed around the raw sewage pumping station to protect operators from the elements. Above ground diffuser piping and diffusers are scheduled to be replaced in the equalization, grit, aeration, aerobic digester, sludge holding, flow distribution chamber, and chlorine contact tanks. As each tank is drained, concrete repairs will be completed, new motorized drain valves will be installed, and the tank floors will be grouted to drain properly. New blowers will be provided for the equalization tanks to isolate the diffuser system per Ten State Standards. In addition, the equalization basin overflow will be rerouted to the head of the treatment plant. New positive displacement aeration blowers will be installed to replace the existing centrifugal blowers which are beyond their useful life. The pumps and pump motors within the existing sludge pump building will be replaced with new pumps and motors with VFDs to more efficiently regulate flows. Both final clarifiers will have their internal components replaced, including, but not limited to, the center columns, rake arms, clarifiers bridges, skimmers, scum beaches, baffles, and weirs. The replacement of an existing 300 kW standby emergency generator with a new 1 MW standby emergency generator and transfer switch to provide all treatment processes with power during an electrical outage. For Health and Safety, the existing chlorination channels will be converted to ultraviolet (UV) disinfection channels along with enhanced post-aeration. The SCADA system will be expanded to allow functioning and monitoring of the plant processes from a single location. The existing septage receiving station will be converted to a City vacuum truck only receiving station. Additional architectural, electrical, and mechanical restoration of several structures is also included with this project. The construction of a tarp barn will allow the City to store materials on site. Additional site improvements include the modification of the plant entrance and resurfacing of Morning Star Drive. Bids must be accompanied by Bid security in the form of either a Bid Guaranty and Contract Bond for the full amount of the bid, or a certified check, cashier's check, or letter of credit pursuant to Chapter 1305 of the ORC, in the amount of 10% of the bid, made payable to the City of Rittman. 5. Bidders must comply with the prevailing wage rates on Public Improvements in Wayne County and the City of Rittman, Ohio as determined by the Ohio Department of Commerce, Bureau of Wage and Hour Administration, 614.644.2239. The City of Rittman, Ohio reserves the right to reject any or all Bids, and to waive any nonconformities not involving price, time, or changes in the work.
Post-Bid
Water / Sewer
$12,500,000.00
Public - City
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 13, 2024
October 14, 2024
100 Morning Star Dr, Rittman, OH
Related To This Project
Rittman, OH
Bid Date: Jul 31 2024
Rittman, OH
Bid Date: Aug 16 2019
Rittman, OH
Bid Date: Sep 28 2021
Rittman, OH
Bid Date: Mar 18 2021
Rittman, OH
Bid Date: Mar 21 2023
Rittman, OH
Bid Date: Mar 01 2023
Rittman, OH
Bid Date: Jan 26 2023
Rittman, OH
Bid Date: Jun 24 2022
Rittman, OH
Bid Date: May 11 2022
Rittman, OH
Bid Date: Apr 20 2022
Rittman, OH
Bid Date: Mar 18 2022
Rittman, OH
Bid Date: Apr 08 2022
Rittman, OH
Bid Date: Oct 03 2022
Columbus, OH
--
Ravenna, OH
Bid Date: Jul 17 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.