BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published December 9, 2024 at 7:00 PM

Updated December 10, 2024

Demolition and site work for a mixed-use development in Nashville, Tennessee. Completed plans call for the demolition of a medical facility; and for site work for a medical facility.

The contractor shall provide all tools, equipment, nateria13, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the EHRM Infrastructure Upgrades construction project, in accordance with the attached Specifications and Drawings. The project is located at the: Nashville IA Medical Center 1310 24th Ave. S Nashville, TN 37212 Magnitude of Construction: $20,000,000 to $50,000,000 Questions of a technical nature must be provided in writing and must be submitted by the prospective offerors to Samuel Cornwell. Questions must be submitted only via e-mail to: Samuel.Cornwell@va.gov. The subject line must read: Nashville - EHRM Infrastructure Upgrades - Technical Questions. Oral questions of a technical nature are not acceptable due to the possibility of misunderstanding or misinterpretation. THE CUT-OFF DATE AND TIME FOR RECEIPT OF QUESTIONS IS October 29, 2024 at 3:00pm ET. The Contractor shall begin performance within 10 calendar days and complete it within 630 calendar days *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Question Deadline 10/29/2024 at 2:00 PM CT Project No. 18235210

Bid Results

Medical

$24,607.00

Public - Federal

Demolition, Site Work

416

37

10

6

Subscribe For Documents

50 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
154
Active Projects
66
Bidding Soon
1,250
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

December 3, 2024

February 3, 2025

Project location map

1310 24th Ave S, Nashville, TN


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.