BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Cherry Valley, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Proposals are now being accepted for replacing approximately 1,600 lineal feet of 8" water main with 12", from the intersection of Lawrence and Elgin Street to the existing 12"water main in front of Village Hall (806. E. State Street). The improvements include Installation of 12" diameter water main, remove and replace Fire Hydrants assemblies, Installation of Valves, replace water services, Removal and Replacement of Concrete Curb and Gutter, Pavement Patching and Site Restoration. Each proposal must be accompanied by a certified check, cashiers check, or bid bond, payable to the Village of Cherry Valley for the amount not less than five percent (5%) of the total amount of the proposal. All bidders shall note the following: (1) construction monies will be drawn from local funds on hand: (2) the successful contractor will be paid on a monthly basis according to the approved estimate of completed work: (3) the Village strongly urges all contractors to employ the use of local subcontractors, suppliers, and trades as much as possible for this contract. Labor rates shall be in accordance with the General Prevailing Rate of Wages for the Village of Cherry Valley, Winnebago County, Illinois, and which are on file in the Office of the Department of Labor, Springfield, Illinois. Such rates shall be paid for all laborers, workman, or tradesman performing work under this contract. The Village reserves the right to reject any or all bids on each proposal, and to waive any information there in or to accept any proposal considered in the best interest of the Village. No bid shall be withdrawn after the opening of bids without written consent of the Village of Cherry Valley for a period of forty five (45) days after the scheduled time of closing of bids.

Post-Bid

Water / Sewer

$200,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
107
Bidding Soon
2,101
All Active Projects
903
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 17, 2024

August 19, 2024

img_map_placeholder

Elgin St, Cherry Valley, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.