Site work and paving for a mixed-use development in Aurora, Colorado. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Reference Number 0000356691 This project will involve rebuilding five traffic signals, revising lane configurations, and updating turn lanes with new striping. Additionally, it will enhance pedestrian connectivity and improve access to bus stop facilities. Major tasks under this contract include realigning curbs and gutters, constructing sidewalks, installing traffic signals at five intersections, adjusting water valves, constructing storm sewers, laying asphalt, applying striping and signage, and installing curb ramps. Question Deadline 07/16/2024 at 3:00 PM MT Questions are submitted online No, Bidders may make written inquiries concerning this ITB to obtain clarification of requirements. Written inquiries shall be emailed to: Angie Young, Senior Procurement Agent, at ayoung@auroragov.org AND Rhaj Khanzadeh, Project Manager, at rkhanzad@auroragov.org AND Cathy Valencia, Capital Improvements Manager at cvalenci@auroragov.org. Buyer Preferences, Guidelines & Requirements General Requirements - Bid Deposit Required - Federally Funded - Insurance Required - Prevailing Wage Required Bonding Requirements - Bid Bond 5 % - Performance Bond 100 % - Payment Bond 100 % The Contract Documents require that all work be completed by July 31, 2025 after issuance of Notice to Proceed. Failure to complete the work as prescribed shall be considered as a Breach of Contract and subject to Liquidated Damages which are $4,500.00 per day. The estimated cost for this project is from $3,200,000.00 to $3,750,000.00. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City of Aurora reserves the right to reject any and all Bids, to waive informalities and irregularities, and to accept that bid which is considered to be in the best interest of the City.

Post-Bid

Roads / Highways

$3,750,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

9

Subscribe For Documents

111 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Definitions, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Bonds, Warranties
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing
Division 08 - Openings

Division 08 - Openings

Hardware, Glazing, Glass Glazing
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Air Distribution, HVAC Fans
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment, Battery Equipment, Static Uninterruptible Power Supply, Lighting
Division 27 - Communications

Division 27 - Communications

Communications
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Backfill, Compaction, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Curbs and Gutters, Paving Specialties, Pavement Markings, Planting
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Fuel Distribution Utilities, Natural-Gas Distribution
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
104
Active Projects
52
Bidding Soon
909
All Active Projects
432
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

September 30, 2024

img_map_placeholder

Havana St & Del Mar Pkwy, Aurora, CO

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

11th Ave, Havana St. and Del Mar Parkway Intersection Improvements

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.