BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Tupelo, Mississippi. Completed plans call for site work for a water / sewer project.

Bids are related to the construction of drainage improvements to include the installation of drainage pipes, inlets and related infrastructure within existing ditches/ drainage ways located in the vicinity of Chickasaw Trail & S. Gloster St. within the City of Tupelo. The contractor will be required to shape existing ditch sections as well install approximately 800 LF of 30" HDPE drain pipe; 160 LF of 58" x 36" RCAP; and 220 LF of 73" x 45" RCAP with related inlets, etc. along the project corridor. The Project shall make provisions for all labor, materials, equipment and incidentals required to provide the improvements as defined in the Proposal document and as represented in the, Project Drawings and Technical Specifications as set forth in the Contract Documents. All proposed improvements are/shall be located within existing property / rights-of-way owned and maintained by the City of Tupelo. The total Contract Time shall not exceed 60 consecutive calendar days. This project is being supported in whole or in part by the American Rescue Plan Act (ARPA), federal award number SLFR2621 awarded to CITY OF TUPELO by the U.S. Department of the Treasury, and also through funds made available to the State of Mississippi pursuant to the American Rescue Plan Act of 2021 by the US Department of the Treasury under Federal Award # SLFRP0003 and CDFA No. 21.027. The OWNER is an Equal Opportunity Employer. The OWNER encourages Minority-owned Business Enterprises (MBE's) and Women- owned Business Enterprises (WBE's) to submit bids. The bid solicitation will be submitted by the OWNER to the Agency Bid Bank at agencybidbank@mississippi.org. Award will be made to the lowest and best bidder and the Mayor and City Council reserve the right to reject any and all bids and to waive any and all informalities. Should a BIDDER find discrepancies in, or omissions from, the drawings or specifications or should they be in doubt as to their written meaning, they should at once notify the ENGINEER, who will send a written instruction or interpretation to all known holders of the documents. The ENGINEER will not be responsible for any oral instructions.

Award

Water / Sewer

$390,009.00

Public - City

Site Work

15

12

7

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
27
Bidding Soon
328
All Active Projects
139
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

September 2, 2024

img_map_placeholder

Multiple Locations, Tupelo, MS

Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.