BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Chesapeake, Virginia. Completed plans call for site work for a water / sewer project.

The project is generally described as: conduct well testing and evaluation, install new pump, pour replacement concrete pad, move and set existing pump house at the St. Brides Correctional Center, 701 Sanderson Rd, Chesapeake, VA. The time for project substantial completion is 120 days (from the notice to proceed to substantial completion). Final completion will be achieved 30 days after substantial completion. General Description: Conduct well testing and evaluation, install new pump, new concrete pad, move and set existing pump house. Furnish all the materials, labor, equipment, tools, transportation, and supervision for a complete project that includes (but is not limited to) the following work: 1. Remove the existing submersible pump assembly and flush water in the well overnight. 2. Conduct a Camera Survey/video of the entire casing to determine the condition of the well casing and screens and provide analysis and recommendations. 3. The well will be chlorinated overnight, and the de-chlorinated water will be pumped off. Pull a new well series samples and 1st Bacteriological sample. 4. Conduct a 48-hour Yield and Drawdown test and monitor well level and collect new well samples series for analysis. 5. Proceed with well chlorination and installation of new permanent pump designed to pump 140 GPM@ 100' TDH, set on approx. 80' of 2-1/2" riser pipe with new submersible cable. 6. Tie-in new piping into the existing discharge piping. 7. Submit test data and analysis of well along with any recommendations. 8. Disassemble the existing building. 9. Demo and remove existing concrete pad and dispose of debris offsite. 10. Form, place 6" gravel, install rebar (#4 at 6" o.c. each way), and re-pour 10'x4"x12'x4"7" Pad, 4'x8'x7" Entry Pad and 2'6"x1'6"x8" Splash Block. Use min. 4,500 psi conc. 11. Reassemble the existing building, set the building plumb and level, and anchor the building to the newly poured pad after adequate cure time. Seal all cracks and holes. Additional Information: 1. All work is outside the secure perimeter fence. 2. The location of Well #1 is provided in the attached drawing. 3. The estimated depth of the existing well is 152 ft. and the pump set is 105 ft. according to information on file. Well#1 has been offline since 2005. 4. The pump test water can be sent to a drainage ditch that is connected to two large ponds onsite. The ditch is approximately 75 ft. from the well site. De-chlorinate the discharge 5. Recommended project work hours are Monday thru Friday from 6:30am to 4:00PM. 6. No bid bond is required. We will use the standard DEB Form CO-9 construction contract. Site Access: 1. Any site visit must be coordinated with the ESU site staff. 2. Access to well#1 can be gained by going through the security checkpoint at the entrance of the institution. Then simply drive around the backside of the prison to the old building and grounds building. The well is located right behind the old B&G building.

Bid Results

Water / Sewer

$99,892.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
149
Active Projects
72
Bidding Soon
1,335
All Active Projects
591
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

July 17, 2024

September 16, 2024

February 13, 2025

img_map_placeholder

701 Sanderson Rd, Chesapeake, VA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.