BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a playground / park / athletic field in Temple, Texas. Completed plans call for site work for a 60,000-square-foot playground / park / athletic field.

Addition of two tennis courts to an existing complex as well as the addition of six pickleball courts; will include courts, shade structures, and seating. Question Deadline 09/04/2024 at 12:00 PM CT Deadline for Questions related to Bid Submit questions in writing to the engineer of record Tyler Richburg, PLA, Covey Planning + Landscape Architecture at trichburg@coveylandscape.com. As of July 3, 2024, this project is in design. An architect has been selected; however, a general contractor or selection method is not disclosed. A timeline for construction has yet to be announced. Work covered by this section of the specifications shall conform to the contract documents, engineering plans as well as state and local codes. B. The purpose of these specifications is to define the lighting system performance and design standards for Temple Crossroads Park using an LED Lighting source. The manufacturer / contractor shall supply lighting equipment to meet or exceed the standards set forth in these specifications. C. The sports lighting will be for the following venues: 1. Tennis Courts 7 & 8 2. Pickleball Courts 1-6 D. The primary goals of this sports lighting project are: 1. Guaranteed Light Levels: Selection of appropriate light levels impacts the safety of players and the enjoyment of spectators. Therefore, light levels are guaranteed to not drop below specified target values for a period of 25 years. 2. Environmental Light Control: It is the primary goal of this project to minimize spill light to adjoining properties and glare to players, spectators, and neighbors. 3. Cost of Ownership: To reduce the operating budget, the preferred lighting system shall be energy efficient and cost effective to operate. All maintenance costs shall be eliminated for the duration of the warranty. 4. Control and Monitoring - To allow for optimized use of labor resources and avoid unneeded operation of the facility, customer requires a remote on/off control system for the lighting system. This site already utilizes the Musco Control Link system with these features and this new lighting should integrate in to that system. Fields should be proactively monitored to detect luminaire outages over a 25-year life cycle. All communication and monitoring costs for 25-year period shall be included in the bid. a. Control and monitoring system shall provide contactor control of all existing circuits. Key switches shall be provided to provide field-level control of existing circuit groups *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed. Bid submittals will be received to furnish all labor and materials and perform all work for the construction of the following described project: PICKLEBALL AND TENNIS COURT EXPANSION AT CROSSROADS PARK Construction of 2 new tennis courts and 6 new pickleball courts (2 ADA Accessible). Includes concrete flatwork, courts surfacing, fencing, windscreens, lighting, shade canopies, and seating.

Award

Playgrounds / Parks / Athletic Fields

$1,595,218.00

Public - City

Site Work

50

16

33

5

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
64
Active Projects
35
Bidding Soon
1,734
All Active Projects
656
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 16, 2024

October 7, 2024

img_map_placeholder

7325 Prairie View Rd, Temple, TX

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.