BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 14, 2024 at 8:00 PM

Updated August 15, 2024

Site work and paving for a mixed-use development in Hutton, Illinois. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

As of July 24, 2024, this project has not yet been awarded. The project is expected to be awarded on August 13, 2024. City/County : Coles Description: 355 CuYd - Earth Excavation 235 CuYd - Earth Ex for Widening 0.6 Acre - Seeding, CL 2 55 Lb - Nitrogen fertilizer Nutrient 55 Lb - Phosphorus Fertilizer Nutrient 55 Lb - Potassium Fertilizer Nutrient 0.6 Acre - Mulch, Method 2 180 Lb - Temp Erosion Control, Seed 40 Ft - Temp Ditch Checks 2,584 Ft - Perimeter Erosion Barrier 7 Ton - Stone RipRap, A4 1,495 SqYd - Subbase Gran Matl, 6'' 53 SqYd - Aggregate Base Course, A 6" 365 SqYd - Aggregate Base Course, A 10" 554 SqYd - PCC Base Course Widening, 6" 101 SqYd - PCC Base Course Widening, 8" 7 Ton - Aggregate Surface Course, B 939 Lb - Bituminous Materials, Prime Ct 2,854 Lb - Bituminous Materials, Tack Ct 98 SqYd - HMA Surface Removal, Butt Jt 326 Ton - HMA Binder Course, IL 9.5, FG, N70 386 Ton - HMA Surface Course, IL 9.5, N70 10 Ton - Incidental HMA Surface Course 5.2 SqYd - PCC Driveway Pavement,6" 100 SqYd - PCC Driveway Pavement, 8" 69 SqYd - PCC Sidewalk, 4" 3,548 SqYd - HMA Surface Removal, 2 1/2" 360 SqYd - HMA Pavement Removal, 3" 183 SqYd - Driveway Pavement Removal 2,839 Ft - Gutter Removal 36 SqFt - Sidewalk Removal 17 Ton - Aggregate Shoulders, B 22.5 CuYd - CL SI Concrete (lnlet, Outlet, & Entrance) 1 LSum - Mobilization 500 Ft - Short Term Pavement Marking, 4" 2,100 Ft - Paint, Pavement Marking, Line 4" 460 SqYd - Surface Removal, Variable Depth (SPL) 30 CuYd - CL SI Conc (lnlet, Outlet, & Entrance) SPL 2,320 Ft - Concrete Gutter, B SPL 1 LSum - Traffic Control & Protection SPL 4 Each - Mailbox Remove & Reset Project Location: 0.32mi East of Hutton to Hutton Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764 ILDOT - Earth Excavation Widen re- align and Resurface CH 5, Consisting of Remove gutters and partial existing HMA, PCC Base Cse Widening, Concrete Gutter B(SPL), Agg Base Cse A, HMA Binder and Surface , and other work as listed in plans.

Award

Roads / Highways

$646,740.00

Public - County

Paving, Site Work

45

3

3

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
63
Bidding Soon
788
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 9, 2024

August 8, 2024

Project location map

Multiple Locations, Hutton, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.