BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a mixed-use development in Fremont, California. Completed plans call for site work for a playground / park / athletic field; and water / sewer project.

The project consists of the temporary construction fencing, removal and disposal of existing play equipment, the removal and disposal of existing poured in place synthetic safety surfacing, installation of new poured in place synthetic safety surfacing, and installation of new upgraded play equipment, relocation of perforated pipe, Question Deadline 07/17/2024 at 5:00 PM PT Questions, requests for information, and requests for clarification regarding the Project, the bid procedures, or any of the Contract Documents must be submitted to City in writing, addressed to the Project Manager for the Project, as follows: Connie Chao, Landscape Designer 39550 Liberty Street Fremont, CA 94537 cchao@fremont.gov Location and Description. The Project is located at Booster Neighborhood Park on Gable Drive between Forner Street and McDuff Avenue, Fremont, CA The Bid Proposal must be accompanied by bid security of ten percent of the maximum bid amount, in the form of a cashier's or certified check made payable to City, or a bid bond executed by a surety licensed to do business in the State of California on the Bid Bond form included with the Contract Documents. The bid security must guarantee that, upon award of the bid, the successful bidder will execute the Contract and submit the payment and performance bonds, the insurance certificates, and the other documentation required by the Contract Documents, within ten days after City's issuance of the Notice of Award. The successful bidder will be required to provide performance and payment bonds, each for 100% of the Contract Price. The successful bidder will be required to provide a Warranty Bond for 20% of the Contract Price. The estimated construction cost, or construction cost range, for the project is $648,835. This estimate serves only as a guideline to bidders of the scope of the Time for Completion. The planned timeframe for commencement and completion of construction of the Project is: 90 (ninety) working days.

Award

Playgrounds / Parks / Athletic Fields

$717,706.00

Public - City

Site Work

13

14

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
160
Active Projects
82
Bidding Soon
1,725
All Active Projects
740
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 23, 2024

August 22, 2024

img_map_placeholder

Gable Dr, Fremont, CA

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.