BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Ellisville, Mississippi. Completed plans call for the renovation of a educational facility.

ARPA Mitigation II Ellisville State School A. Work Covered: Work covered by the Contract Documents is as shown in drawings and described in wordsin the Project Manual. The Project Title and location is indicated on the first page of this Project Manual. B. Start of Work: Work shall be started immediately upon issuance of a Notice to Proceed. Prior to this, all Contracts and beginning documents will have been executed and insurance in force. C. Time of Completion: The completion of this Work is to be on, or before, the time indicated in the Standard Form of Agreement Between the Owner and the Contractor. D. Contractor's Duties: 1. Except as specifically noted, provide and pay for: a. Labor, materials and equipment. b. Tools, construction equipment and machinery. c. Water, heat and utilities required for construction. d. Other facilities and services necessary for proper execution and completion of the Work. 2. Pay legally required sales, consumer, use, payroll, privilege and other taxes. 3. Secure and pay for, as necessary for proper execution and completion of work, and as applicable at the time of the receipt of the bids: a. Permits. b. Government fees. c. Licenses. 4. Give required notices. 5. Comply with codes, ordinances, rules, regulations, orders and other legal requirements of public authorities which bear on performance of work. 6. Promptly submit written notice to Professional of observed variance of Contract Documents from legal requirements. It is not the Contractor's responsibility to make certain that drawings and specifications comply with codes and regulations. Appropriate modifications to Contract Documents will adjust necessary changes. Assume responsibility for work known to be contrary to such requirements, without notice. 7. Enforce strict discipline and good order among employees. Do not employ or work unfit persons, or persons, not skilled in assigned task. 8. Provide a written safety plan. E. Hazardous Materials: The Prime General Contractor is responsible for the removal and disposal of any hazardous materials encountered in the performance of the Contract requirements. Hazardous Containing Materials [HCM] include, but are not limited to, Asbestos and Lead Paint and should be identified and removed as a part of the Contract. The absence of details does not relieve the Prime General Contractor from the responsibility of removal and disposal; but, a Change Order could be executed in the absence of identified HCM in the documents. F. Coordination: The Prime General Contractor is responsible for the coordination of the total project. All other Contractors and all Subcontractors will cooperate with the Prime General Contractor so as to facilitate the general progress of the Work. Each trade shall afford all other trades every reasonable opportunity for the installation of their work. The Bureau of Building, Grounds and Real Property Management Reserves the Right to Waive Irregularities and to Reject Any or All Bids. QUESTIONS: Questions should be directed to the Professional. Should a Bidder find discrepancies in, or omissions from, the procurement documents, or be in doubt as to their meaning, the Bidder should immediately notify the Professional. The Professional will send written instruction(s) or interpretation(s) to all known holders of the documents. Neither the Owner, nor the Professional, will be responsible for any oral instruction or interpretation

Bid Results

Educational

$4,090,150.00

Public - State/Provincial

Renovation

127

17

18

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
29
Bidding Soon
333
All Active Projects
143
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

August 29, 2024

img_map_placeholder

1101 US-11, Ellisville, MS

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.