BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Ontario, California. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Liquidated Damages $13,200 Per Calendar day License Requirements Class "A" Start/Delivery Date Ten (10) calendar days after the Notice to Proceed Project Duration Three hundred eighty (380) working days Bid Bond 10.00% Payment Bond 100.00% Performance Bond 100.00% Online Q&A Yes Q&A Deadline 09/05/2024 11:00 AM (PDT) The work to be performed consists in general of widening the approaches of the intersection of Grove Avenue and Holt Boulevard. It includes construction of roadway improvements, sewer systems, storm drainage systems, water systems, grading, landscaping, traffic signals, street lighting, utilities and associated removals/relocations, and protection and/or relocation of existing facilities. The sewer system construction is on Grove Avenue from Airport Drive to Holt Boulevard, and Holt Boulevard from Grove Avenue to 500' East of Grove Avenue and consists of the installation of approximately 176 linear feet of 21-inch Extra Strength V.C.P. sewer main, approximately 411 linear feet of 20-inch Ductile Iron Class 350 with Protecto 401 Ceramic Epoxy Lining sewer main, approximately 1,016 linear feet of 21-inch Vitrified Clay Jacking Pipe within 48-inch steel casing pipe with trenchless pipe jacking method, and approximately 18 linear feet of 15-inch Extra Strength V.C.P. sewer main, installation of new sewer manholes; connection to existing sewer systems at two street intersections, implementation of traffic control during construction, and pavement repair and street restoration. The Contractor is responsible for protecting all existing utility services within the project site and providing time and working space for utility relocations as may be required during construction activity. Sewer installation in Grove Avenue under Union Pacific Railroad (UPRR) Bridge Crossing will be by trenchless method. The Contractor shall comply with the Union Pacific Railroad (UPRR) for the construction within the UPRR right of way, which includes construction of an encased sewer main underneath then Railroad Bridge. The Contractor is required to maintain traffic through the project site as required in these specifications. Other items of work or details not mentioned above that are required by the Plans, Specifications, or Technical Specifications, shall be performed, placed, constructed, and/or installed.

Post-Bid

Water / Sewer

$21,318,434.00

Public - City

Outdoor Lighting, Paving, Site Work

106

19

4

4

Subscribe For Documents

138 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
497
Active Projects
248
Bidding Soon
3,763
All Active Projects
1,668
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 20, 2024

November 19, 2024

April 28, 2026

img_map_placeholder

Grove Avenue and Holt Boulevard, Ontario, CA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.