Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published July 4, 2024 at 8:00 PM
Updated October 1, 2024
This is a service / maintenance or supply contract in South Easton, Massachusetts. Contact the soliciting agency for additional information.
Under this bid a single manufacturer shall supply and manage all endpoints, Advanced Metering Analytics (AMA) software, software hosting, customer portal, training and installation support necessary to furnish a fixed network meter reading system using the secure public cellular network that does not require the utility to install or maintain gateways. While a primary function shall be to provide accurate and timely meter reading data for billing purposes, the system shall also furnish meter consumption information in 15-minute intervals, provide a mobile backup message for use in trouble shooting and installation of the device and meter-based analytical alarms to facilitate enhanced utility operation and management of the total water distribution system. The system must be compatible with the towns current metering software: Beacon Advanced Metering Analytics Software and it must be capable of reading the current AMR radios in the system and bringing the reads into the software. Single Supplier - the system being proposed must be from a single manufacturer including meters, registers, endpoints, software, and customer portal. The term of this contract shall extend from July 1, 2024 through June 30, 2025. The Town, at its sole direction, shall have the option to extend for one (1) additional year period, July 1, 2025 through June 30, 2026, with no changes in the contract price or terms and conditions, and at its sole direction with mutual consent of the contractor, the option to extend for an additional one (1) year period, July 1, 2026 through June 30, 2027. Each Bid must be accompanied by a bid security consisting of a BID BOND, CASH, or, CERTIFIED CHECK issued by a responsible bank or trust company in the amount of 5% of the bid price. All bids for this project are subject to applicable public bidding laws of Massachusetts. The contract will be awarded to the bidder deemed by the awarding authority to be the lowest responsible and eligible bidder. The Town of Easton is an affirmative action/equal opportunity owner/purchaser. The bidder agrees that its bid shall be good and may not be withdrawn for a period of 30 days, Saturdays, Sundays and legal holidays excluded, after the opening of the bids. The Town reserves the right to waive any informalities, to accept or reject, in whole or in part any or all bids, or take whatever other action may be deemed to be in the best interest of the Town.
Post-Bid
Water / Sewer
Public - City
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 31, 2024
August 30, 2024
Multiple Locations, South Easton, MA
Related To This Project
South Easton, MA
Bid Date: Aug 15 2024
South Easton, MA
Bid Date: Jul 22 2024
South Easton, MA
Bid Date: Aug 15 2024
South Easton, MA
Bid Date: Sep 12 2024
South Easton, MA
Bid Date: Oct 11 2024
South Easton, MA
Bid Date: Sep 27 2024
South Easton, MA
Bid Date: Jan 17 2025
South Easton, MA
Bid Date: Feb 07 2025
South Easton, MA
--
South Easton, MA
Bid Date: Mar 05 2024
South Easton, MA
Bid Date: Aug 19 2021
South Easton, MA
Bid Date: Aug 19 2021
South Easton, MA
--
South Easton, MA
--
South Easton, MA
Bid Date: Sep 23 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.